My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IsoftStone 2/26/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
IsoftStone 2/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 1:50:37 PM
Creation date
2/28/2024 1:50:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IsoftStone
Approval Date
2/26/2024
End Date
12/31/2024
Department
Communications
Department Project Manager
Nichole Webber
Subject / Project Title
ADA web audit
Tracking Number
0004198
Total Compensation
$10,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />PROFESSIONAL SERVICES AGREEMENT <br />This Professional Services Agreement (“Agreement”) is effective as of the date of the <br />Mayor’s signature below and is between the City of Everett, a Washington municipal corporation <br />(the “City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). <br />This Agreement is for the purpose of the Service Provider providing services as set forth in this <br />Agreement. This Agreement includes the Basic Provisions, the attached General Provisions, and <br />the scope of work attachment, if any, referenced in the Basic Provisions. <br />BASIC PROVISIONS <br />Service Provider <br />iSoftStone Inc. <br />188 106TH AVE NE STE 610 <br />Bellevue, WA 98004 <br />andrew.baker@isoftstone.com <br />City Project Manager <br />Nichole Webber <br />City of Everett – Communications and Engagement <br />2930 Wetmore Ave Suite 10-A <br />Everett, WA 98201 <br />nwebber@everettwa.gov <br />Scope of Work (must select one) <br />☒Scope of Work is attached. One sentence summary of scope of work is as <br />follows: URL review <br />☐Scope of Work is not attached. Instead, the Scope of Work is as follows: <br />Enter scope of work here. If space here is insufficient, attach scope of work <br />instead.
The URL can be used to link to this page
Your browser does not support the video tag.