My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/02/28 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/02/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:17:47 PM
Creation date
2/29/2024 8:33:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Page 15 of 17 Category 2: For official use only / disclosure permissible by law. <br />SECTION 4 – ACRONYMS & DEFINITIONS <br />Bidder: see “Supplier”. <br />CFR: Code of Federal Regulations. <br />City Facility: the location(s) work is to be performed. <br />City: refers to the City of Everett (“COE”), located in Washington State. <br />Contractor: see “Supplier”. <br />Contract Administrator: see “Procurement Professional”. <br />Cost Analysis: comparison of offered price to the offeror’s own costs and evaluation of the difference (profit). <br />Equipment: an assembly of machines and components in a logical manner that works systematically to provide <br />an intended, conditioned environment for the facility. <br />Lower Tier Participant: see “Supplier”. <br />Must: see “Shall”. <br />Offeror: see “Supplier”. <br />Price Analysis: comparison of proposed price to comparable pricing data. <br />Prime Contractor: see “Supplier”. <br />Procurement Professional: the individual in Procurement assigned by the City of Everett who is responsible for <br />resolving contractual issues and supporting the Project Manager during Contract performance. This includes the <br />issuance of a written document to amend, modify, or deviate from the Contract terms, conditions, requirements, <br />specifications, details, or delivery schedule. <br />Project Manager: the individual assigned by the requesting department that is responsible for managing, <br />inspecting, and monitoring all Contractor work performed to ensure compliance with the contract requirements. <br />The Project Manager is the Contractor’s primary point of contact and acts as the agency’s representative in charge <br />of work at the site. <br />Proposer: see “Supplier”. <br />RCW: Revised Code of Washington. <br />Recipient: see “City”. <br />Shall or Must: the terms “shall” or “must” are used whenever a specification expresses a requirement by either <br />the City or the Supplier. <br />Subcontractor: the individual, association, partnership, firm, company, corporation, or joint venture entering into <br />an agreement with the Supplier to perform any portion of the work covered by this contract. <br />Submittals: information that is submitted to the City of Everett by the Supplier. <br />Supplier: the individual, association, partnership, firm, company, corporation, or a combination thereof, including <br />joint ventures, submitting a response to perform the work. <br />UCC: Uniform Commercial Code. <br />WAC: Washington Administrative Code. <br />WFP: Water Filtration Plant located in the city of Monroe, Washington. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.