My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/02/28 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/02/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:17:47 PM
Creation date
2/29/2024 8:33:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Page 11 of 20 Category 2: For official use only / disclosure permissible by law. <br />b. Date, time, and net weight per truckload <br />2.9 BIOSOLIDS APPLICATION RATE CALCULATION SUBMITTAL & SITE-SPECIFIC LAND APPLICATION <br />PLAN <br />All suppliers must submit a draft application rate calculation worksheet. A draft application worksheet can <br />be found in Appendix D. <br />A. Application rate worksheets may be submitted with bids or must be submitted no later than the end <br />of the next business day following bid opening for the bid to be considered responsive. <br />1. Worksheets must be submitted for the proposed site location(s) listed in the bid. Calculations <br />will be based off the representative data provided in Appendix A. <br />2. The final nutrients data set will be provided after bid opening. A sample rate calculation <br />worksheet is provided in Appendix D. <br />B. To be considered for award, the Site-Specific Land Application Plan must be submitted by the end of <br />the next business day following the bid opening to the Procurement Professional listed on the <br />coversheet. <br />2.10 CONTRACTOR REGISTRATION <br />The City of Everett is prohibited from executing a contract with a Contractor who is not registered or <br />licensed as required by state law. <br />2.11 PREVAILING WAGE REQUIREMENTS <br />This Request for Quotation includes work that is subject to prevailing wages as required by RCW 39.12 <br />and RCW 49.28 (Hours of Labor) as amended or supplemented. <br />• The wage rates to be paid to all laborers, workers, and mechanics that perform loading, hauling, <br />and unloading of biosolids as a part of this Contract shall not be less than the prevailing wage rates <br />as required by Chapter 39.12 of the Revised Code of Washington, as amended. This requirement <br />applies to laborers, workers, and mechanics whether they are employed by the Supplier, Sub- <br />suppliers, Sub-sub-suppliers, or any other person who performs a portion of the Work completed <br />by this Contract. <br />• The State of Washington prevailing wage rates applicable for this solicitation, which is located in <br />Snohomish County, may be found at the following website address for the Department of Labor & <br />Industries: https://fortress.wa.gov/lni/wagelookup/ <br />In referencing such rates, the City of Everett does not imply or warrant that the Supplier will find labor <br />available at those rates. It is the Supplier's sole responsibility to determine the wage rates actually paid. <br />2.12 INTENTS & AFFIDAVITS <br />Upon receipt of the required documents, the awarded supplier will receive a purchase order which will <br />serve as the contract. Purchase order number and department or requester full name must be on all <br />invoices. <br />At the start of every contract period, the contractor (and any subcontractors if applicable) must file a <br />Statement of Intent to Pay Prevailing Wages with the Industrial Statistician of the Department of Labor <br />and Industrial Services (DLIS). The Department of Labor and Industries charges a fee for such approval
The URL can be used to link to this page
Your browser does not support the video tag.