My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/02/28 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/02/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:17:47 PM
Creation date
2/29/2024 8:33:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
OSOS No. I-8051 <br /> <br />ATTACHMENT A <br />LIBRARY’S SERVICE & ANNUAL SHARE OF COSTS <br />Enterprise Level Managed Equipment Service: <br />Managed equipment service includes equipment, installa�on, licensing, maintenance, monitoring and <br />troubleshoo�ng for the products and quan��es listed below. The costs to WSL were established in the Vendor <br />contract. Library’s Annual Share is the net cost a�er all applicable Program subsidies have been applied. WSL <br />will invoice Library for one-fourth (1/4) of Library’s Annual Share each quarter. <br />Products and Model #s: Quantity Installed <br />Router: Meraki MX105-HW 2 <br />Switch: Meraki MS250-48FP-HW 6 <br />WAP: Meraki MR46-HW (indoor) 20 <br />WAP: Meraki MR86 (outdoor) 8 <br />UPS Unit: APC SMX2000LV 2 <br /> <br />Contracted Annual Costs to WSL: $30,216 <br />Library’s Annual Share: $7,000 <br /> <br />Enterprise Level Internet Service: <br />Internet Service includes an Enterprise Level internet circuit to be installed at the Library for the Service Speed <br />and Quan�ty of Lines listed below. The costs to WSL were established in the Vendor contract. In some loca�ons <br />there will be a Non-Recurring Charge (NRC) for Installa�on in the first year. WSL will not invoice Library for the <br />Service un�l the equipment is installed and the Service has commenced, and will prorate Library’s share of costs <br />based on the number of days in the Program year a�er July 1st that Library was without the Service. Library’s <br />Annual Share is the net cost a�er all applicable Program subsidies have been applied and a por�on will be <br />charged to the Library quarterly. <br /> <br />Description Quantity or Cost <br />Internet Service Speed 1 G @ Main, 1 G @ Evergreen <br /># of Lines 2 <br /> <br />Installation NRC 0 <br />Library’s Share of NRC 0 <br /> <br />Contracted Annual Costs to WSL: $33,806 <br />Library’s Annual Share: $4,057 <br /> <br /> <br />Page 15 of 29
The URL can be used to link to this page
Your browser does not support the video tag.