My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fieldwrks Collaborative LLC 3/1/2024 Change Order 1
>
Contracts
>
6 Years Then Destroy
>
2024
>
Fieldwrks Collaborative LLC 3/1/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 1:30:19 PM
Creation date
3/1/2024 1:30:11 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Fieldwrks Collaborative LLC
Approval Date
3/1/2024
End Date
2/24/2024
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
Everett Performing Arts Center Door Replacement
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004023
Total Compensation
$39,848.64
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Fieldwrks Collaborative LLC 11/16/2023
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ #2023-124 Everett Performing Arts Center Rollup Door Replacement <br />Description of Change: <br />BUILDING/LOCATION: 2710 Wetmore Avenue, Everett, WA 98201 <br />This change order covers unforeseen shipping and material cost increases and extends the <br />completion date by ten days. <br />During project development, the Everett Performing Arts Center (EPAC) established an acceptable <br />installation timeframe based on scheduled performances. If installation were not completed in the <br />allocated timeframe, the project would be delayed almost two additional months, which would <br />continue to risk the facility's security. <br />Unfortunately, between the issuance of the Notice to Proceed and when the City approved <br />submittals, the lead time for the originally specified motor increased dramatically. Due to the <br />increased lead time of the initially established motor, the contractor was required to change the <br />motor brand to one that could be provided on an expedited delivery schedule to meet project <br />timelines, which resulted in an unforeseen increase in cost for expedited shipping of the materials to <br />Additionally, the original quote for the new roll-up door expired due to <br />unforeseen delays during the contracting and submittal review process. The new subcontractor <br />quote resulted in an additional increase in material costs. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change $37,366.00 Contract Time & Completion Date Prior <br />to This Change 90 <br />Completion <br />Date Prior <br />2/14/24 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change+$2,482.64 Net (Increase) or (Decrease) Resulting <br />from this Change 10 <br />* Total Project Price, Including this Change $39,848.64 Contract Time & Completion Date <br />Including This Change 100 <br />Completion <br />Date After <br />2/24/24 <br />By signing below, the City of Everett and the Contractor agree that the Contract work shall be changed to the extent <br />described in <br />compensation for all such changes, including all direct and indirect costs and impacts. The City of Everett and the <br />Contractor further agree that Contract time shall be adjusted to the extent shown above. This Change Order only <br />changes the contract between City of Everett and the Contractor to the extent explicitly provided in this Change Order. <br />Signatures on this change order may be ink, scanned pdf signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />Fieldwrks Collaborative LLC <br />PO Box 999 <br />Toledo, WA 98591 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department Director: <br />Name & Title:Marita Levanen, Owner City Attorney Template Approved as to Form 7.14.23 <br />0001
The URL can be used to link to this page
Your browser does not support the video tag.