My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fieldwrks Collaborative LLC 3/1/2024 Change Order 1
>
Contracts
>
6 Years Then Destroy
>
2024
>
Fieldwrks Collaborative LLC 3/1/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 1:30:19 PM
Creation date
3/1/2024 1:30:11 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Fieldwrks Collaborative LLC
Approval Date
3/1/2024
End Date
2/24/2024
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
Everett Performing Arts Center Door Replacement
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004023
Total Compensation
$39,848.64
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Fieldwrks Collaborative LLC 11/16/2023
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2023-124 EPAC Replacement Door <br />CO1_022924_SD <br />Final Audit Report 2024-03-01 <br />Created:2024-03-01 <br />By:Marista Jorve (mjorve@everettwa.gov) <br />Status:Signed <br />Transaction ID:CBJCHBCAABAAI39OAAXt8SyA6OunbCesMMw-X-In3LjC <br />"2023-124 EPAC Replacement Door CO1_022924_SD" History <br />Document created by Marista Jorve (mjorve@everettwa.gov) <br />2024-03-01 - 7:21:31 PM GMT <br />Document emailed to Jenny Chang (JCHANG@EVERETTWA.GOV) for approval <br />2024-03-01 - 7:22:17 PM GMT <br />Email viewed by Jenny Chang (JCHANG@EVERETTWA.GOV) <br />2024-03-01 - 7:29:44 PM GMT <br />Document approved by Jenny Chang (JCHANG@EVERETTWA.GOV) <br />Approval Date: 2024-03-01 - 7:29:54 PM GMT - Time Source: server <br />Document emailed to marita@fieldwrks.com for signature <br />2024-03-01 - 7:29:55 PM GMT <br />Email viewed by marita@fieldwrks.com <br />2024-03-01 - 8:17:57 PM GMT <br />Signer marita@fieldwrks.com entered name at signing as Marita Levanen <br />2024-03-01 - 8:19:05 PM GMT <br />Document e-signed by Marita Levanen (marita@fieldwrks.com) <br />Signature Date: 2024-03-01 - 8:19:07 PM GMT - Time Source: server <br />Document emailed to Tim Benedict (TBenedict@everettwa.gov) for approval <br />2024-03-01 - 8:19:08 PM GMT <br />Email viewed by Tim Benedict (TBenedict@everettwa.gov) <br />2024-03-01 - 8:19:53 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.