Laserfiche WebLink
ASSEMBLY TIPS a TOOLS <br /> Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. <br /> Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. <br /> Use Teamwork: Two or more people are required to assemble your building. One person can hold <br /> the parts or panels in place while the other person fastens them together and handles the tools. This <br /> makes the process of assembling your building faster and safer. <br /> Tools and Materials: Here is a list of some basic tools and materials you will need to assemble <br /> your building. Decide which method of anchoring and the type of base you will use to make a complete <br /> list of the materials you will need. <br /> c <br /> WHAT YOU NEED <br /> • Work Gloves <br /> I Safety Glasses <br /> i Nut Driver or Wrench <br /> • Step Ladder 8' <br /> Power Drill (Cordless,Variable Speed) <br /> y r'� <br /> 1 7 Pliers <br /> Utility Knife or Scissors <br /> ,IL Carpenters Level <br /> �� • Tape Measure <br /> ® Clamp <br /> • Grout(Asphalt Base) <br /> • 718" x 13" Masonry Bit(Asphalt Base) <br /> • 1l2" x 8" Masonry Bit (Concrete Base) <br /> RECOMMENDED TIME SAVERS <br /> • Square <br /> • String (For squaring the frame) <br /> �r Awl (to align holes) <br /> How to Select and Prepare YourBuilding Site: Before you start to assemble your <br /> building, you will want to decide on a good location. The best location is a level area with good drainage. <br /> •Allow enough working space so it is not difficult to move parts into position for assembly.Also,there needs to be enough <br /> space outside the building to be able to fasten the panel screws from the outside. <br /> • Before assembling any parts, your base should be constructed and an anchoring system should be ready to use. <br />