My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8514 SHADOW WOOD DR Lot 3 2024-03-29
>
Address Records
>
SHADOW WOOD DR
>
8514
>
8514 SHADOW WOOD DR Lot 3 2024-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 11:29:58 AM
Creation date
3/6/2024 10:38:52 AM
Metadata
Fields
Template:
Address Document
Street Name
SHADOW WOOD DR
Street Number
8514
Unit
Lot 3
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snohomish County Utility Permit Number 23 106751 D8 <br />City of Everett; Work Order Number U2304-004, 005 and 006 <br />ABGB SP; PFN 20102563 <br />April 18, 2023 <br />A pre -con will NOT be required prior to construction. Contact Jared Anderson <br />425 231 8111 to advise of job start and for final inspection. <br />A Dept. of Public Works traffic control permit is required prior to construction. <br />Public Works must be contacted if the construction activity is within the vicinity of <br />a signaled intersection. (SCC 13.40) <br />Trench compaction control tests will be provided by a licensed engineering <br />consultant. <br />Trench restoration required per EDDS Chapter 8, Drawing 8-030/040. <br />A minimum 2 inch Class B asphalt full -width street overlay is required, with <br />preleveling and surface preparation per EDDS Chapter 8. <br />All traffic striping and walkway delineation removed during a construction project <br />shall be replaced. Temporary striping shall be used on a limited basis and only <br />as approved by the Traffic Engineer. All permanent striping and channelization <br />shall be installed by County forces at the expense of the utility or permit holder. <br />If County forces are unavailable to perform the striping installation within an <br />appropriate timeframe, the utility or permit holder shall contract for the striping <br />installation. Traffic Operations shall be contacted at least 2 days in advance of <br />installation to verify channelization layout. <br />Improvement bond amount in the amount of $6,600.00 (Received 4/18/2023). <br />
The URL can be used to link to this page
Your browser does not support the video tag.