Laserfiche WebLink
Page 2 of 2 <br />\\KIR-FS1\Project\P23\2023 PROPOSALS\ENGINEERING\P23-662 Forest Park Pickleball Courts\2024-01-03\Survey Proposal.docx <br />No permit or recording fees will be required. <br />One on-site meeting will be needed to discuss project concerns after the drawing is complete, with <br />an additional day of field and office for pick-ups after site meeting. <br />Terms and Conditions <br />See attached Terms and Conditions. <br />Time Schedule: <br />We are available to commence work within 2 weeks of notice to proceed and anticipate the drawing <br />completed within an additional week. <br />Fee: <br />The survey will be done on a Time and Expenses basis in the amount not to exceed $12,490. <br />Authorization to Proceed <br />If the foregoing meets with your acceptance, please sign one copy of this letter, initial the PACE <br />Terms and Conditions, and return one copy of each for our records as our authorization to <br />continue with the services stated. PACE looks forward to working with you on this project. If you <br />have any questions or need additional information, please call us at 425.827.2014, or email me. <br />Respectfully, <br />PACE ENGINEERS, Inc. <br />William R. Hawkins P.L.S. <br />Sr. Principal Surveyor