My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2343-98
>
Ordinances
>
Ordinance 2343-98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 4:16:20 PM
Creation date
3/20/2014 4:16:20 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2343-98
Date
11/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2343-98 <br /> AN ORDINANCE creating a special improvement project entitled <br /> "Riverfront Overcrossing and Riverfront Parkway", Fund 303, <br /> Program 037, to accumulate all costs for the improvement project. <br /> WHEREAS, the City of Everett is committed to a planned street and road improvement <br /> program as a part of the City Transportation Improvement Program; and <br /> WHEREAS, the City of Everett has received approval for the utilization of Federal funds for <br /> the development of an overpass of the BNSF mainline tracks in the vicinity of 38th Street and <br /> a new street, Riverfront Parkway, as an improvement project; and <br /> NOW,THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 037, entitled <br /> "Riverfront Overcrossing and Riverfront Parkway" to accumulate all costs for the <br /> improvement project. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 037, for design and construction of the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Engineering/Public Services Director", under <br /> direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of $867,200.00 is hereby appropriated to Fund 303, Program 037, "Riverfront <br /> Overcrossing and Riverfront Parkway" as follows: <br /> A. Estimated Project Costs <br /> Preliminary Engineering $ 867,200 <br /> Total Estimated Cost $ 867,200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.