Laserfiche WebLink
AfilEAR/A15 `.I 1/AfE c E5vE. <br /> 11.41 <br /> NOV 3 0 2031 <br /> IN THE MATTER OF THE APPLICATION T <br /> OF CONNELL DESIGN GROUP FOR CITY s eermg/Public See vi <br /> APPROVAL OF A SPECIAL PROPERTY <br /> USE PERMIT SPU #01-017 <br /> (COUNTRY CLUB DAYCARE) <br /> ORDER <br /> On November 9,2001, the decision approving the Special Property Use Permit for the construction of <br /> a single-story wood-framed 3,000 square foot daycare facility with six off-street parking stalls at 1300- <br /> 100th Place SE, Everett,Washington was approved. On November 19, 2001, Paul McKee, City of <br /> Everett Public Works Department,submitted a request of reconsideration of finding#10 which read: <br /> The Applicant submitted that the amount of impervious surface to <br /> be developed on-site will be less than 5,000 square feet. Because <br /> the total area of the proposed project will result in less than 5,000 <br /> square feet of new development, there is no requirement for a <br /> detention system. (Robbins testimony) <br /> Mr. McKee requested that finding#10 be modified to read that while the new daycare to be developed <br /> on-site will create more than 5,000 square feet of new impervious surface,the portion of new <br /> impervious surface that is subject to significant pollutant deposition will be less than 5,000 square <br /> feet. Therefore, the project will be required to provide streambank erosion control (detention),but not <br /> runoff treatment(wetpond). <br /> A review of the record indicates that Mr. McKee's request for reconsideration is consistent with his <br /> testimony. Accordingly,finding of fact#10,as submitted in the November 9, 2001,decision,is <br /> deleted and the following is substituted as finding#10: <br /> The new daycare facility will create more than 5,000 <br /> square feet of new impervious surface. However,the <br /> portion of the new impervious surface that will be subject to <br /> significant pollutant deposition(he. drivable surface)will <br /> be less than 5,000 square feet. Because of this, the <br /> project will be required to provide streambank erosion <br /> control(detention)but,will not be required to provide runoff <br /> treatment(wetpond). <br /> There are no other changes to the November 9,2001,decision. The decision remains as stated, <br /> including all conditions of approval. <br /> Done and dated this 29th day of November, 2001. <br /> lit IDA 1:044,1e <br /> Jam= . Driscoll <br /> Hearing Examiner <br /> CITY OF EVERETT <br /> 2930 Wetmore Ave.:Suite 800•Everett,WA 98201-4044•(425)257-8772.Fax(425)257-8628 <br />