My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 3/13/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Washington State Department of Ecology 3/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 3:47:43 PM
Creation date
3/14/2024 3:47:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
3/13/2024
Council Approval Date
2/21/2024
End Date
3/31/2025
Department
Public Works
Department Project Manager
Dana Zlateff
Subject / Project Title
2023-2025 Biennial Stormwater Capacity Grant
Tracking Number
0004245
Total Compensation
$130,000.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 9 of 22State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />WQSWCAP-2325-EverPW-00090 <br />2023-2025 Biennial Stormwater Capacity Grants <br />City of Everett <br />Documentation of all tasks completed is required. Documentation may include field reports, dates and number of inspections <br />conducted, dates of trainings held and participant lists, number of illicit discharges investigated and removed , summaries of <br />planning, stormwater utility or procedural updates, annual reports, copies of approved QAPPs, summaries of structural or <br />source control activities, summaries of how equipment purchases have increased or improved permit compliance. <br />Ineligible expenses include capital construction projects, incentives or give-a-ways, grant application preparation, Technology <br />Assessment Protocol - Ecology (TAPE) review for proprietary treatment systems, or tasks that do not support Municipal <br />Stormwater Permit implementation. <br />Task Goal Statement: <br />This task will improve water quality in the State of Washington by reducing the pollutants delivered by stormwater to lakes , <br />streams, and the Puget Sound by implementing measures required by Phase I and II NPDES permits. <br />Task Expected Outcome: <br />RECIPIENTs will implement measures required by Phase I and II NPDES permits . <br />Recipient Task Coordinator: Dana Zlateff <br />Deliverables <br />Permit Implementation <br />Number Description Due Date <br />2.1 Documentation of tasks completed <br />Template Version 12/10/2020 <br />DocuSign Envelope ID: 892CFD5B-BDBB-48C0-A552-26812185C2F8
The URL can be used to link to this page
Your browser does not support the video tag.