My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
300 W MARINE VIEW DR 2024-03-27
>
Address Records
>
W MARINE VIEW DR
>
300
>
300 W MARINE VIEW DR 2024-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 9:36:06 AM
Creation date
3/16/2024 10:39:39 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
300
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS UTILITY Date Applied: 5/4/2021 <br /> PERMIT PW Utility Permit#: PW2105-004 <br /> City of Everett Permit Services Parent Permit#: <br /> E V E R E T T <br /> 3200 Cedar Street, 2nd Floor Permit Type: FRANCHISE UTILITY <br /> WASHINGTON Everett, WA 98201 Permit Subtype: PUD <br /> 425-257-8810 Permit Fee: $65.00 <br /> UTILITY COMPANY NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> Snohomish County PUD Moe Nave <br /> PO Box 1107 1802 75th ST SW <br /> Everett,WA,98206 Everett,WA,982036264 <br /> PHONE:4257835681 PHONE:4257835681 <br /> TAX PARCEL ID#:29050700100400 SITE ADDRESS:300 W MARINE VIEW DR <br /> DESCRIPTION:WO 100044650: Replace capacitor bank. <br /> Remove existing 900 KVAR capacitor bank for S&P and replace with new 300 KVAR capacitor bank. Pole A near 402 W Marine View Dr., <br /> Pole B near 300 W Marine View Dr. <br /> PERMIT CONDITION NOTE: Disabling traffic signals during an outage requires a uniformed police officer and a separate approved traffic <br /> control plan. Many traffic signals require a signal technician to restore normal operation following a power outage. Contact Steve <br /> Sawyer at 425-328-0643 a minimum of 48 hours prior to the shutdown to arrange for a signal technician,and with any questions about <br /> the extent of the signal outages when power shutdowns occur. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 2. Call Location Underground Service 48 hours before you dig.The day you call does not count. TOLL FREE NUMBER 811. <br /> 3. All work including Traffic Control must be done in accordance with MUTCD Standards and the attached plans approved by City of <br /> Everett. <br /> 4. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 5.Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614, or as directed by the City PW <br /> Inspector. Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 6. Full lane width grind and overlay is required for trenches greater than 100' in length, multiple cuts within a 100' length section, <br /> and/or as directed by the City PW Inspector. <br /> 7. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 8. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Inspections are required for job start notification, potholing all City utilities,evaluation of traffic <br /> control set-up,to view the work prior to backfill,and after final restoration to final the permit. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items <br /> have been completed. <br /> 9. Potholing required for all crossings over/under City of Everett water mains. <br /> 10. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> Public Works Permit Fee Breakdown: <br /> Misc. Minor Permits.....................................................$25.00 <br /> PW Plan Review.......................................................$20.00 <br /> PW Site Inspection........................... .......................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> n and all claims for damages,costs,expenses,or causes of action that <br /> /evr pow 5/17/2021 may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.