My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4502 HOYT AVE 2024-03-29
>
Address Records
>
HOYT AVE
>
4502
>
4502 HOYT AVE 2024-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 10:38:43 AM
Creation date
3/16/2024 10:44:53 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
4502
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHINGTON <br />PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />Everett, WA 98201 <br />425-257-8810 <br />Date Applied: 3/22/2021 <br />Public Works Permit #: PW2103-048 <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: $85.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />ROURKE TYLER S/BALDWIN BRITTNEY <br />ROURKE TYLER S/BALDWIN BRITTNEY <br />4502 HOYT AVE <br />4502 HOYT AVE <br />EVERETT, WA, 98203 <br />EVERETT, WA, 98203 <br />PHONE: 4259713572 <br />PHONE: 4259713572 <br />TAX PARCEL ID #: 00407800905000 <br />SITE ADDRESS: 4502 HOYT AVE <br />DESCRIPTION: GRADING AND RETAINING WALL IN ROW <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site work to be done per plans approved by the City of Everett Public Works Department dated 05/26/2021. Approved plans must <br />remain on job -site at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br />request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br />6. Install and maintain erosion control measures per City of Everett Standards. Remove upon completion of the project prior to final <br />approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. This wall and all work constructed within the public right -of -way must be removed or relocated at the owner's expense if the City <br />ever requires use of the right-of-way for municipal purposes. <br />10. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the <br />City PW Inspector. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be <br />obtained from the City's Traffic Engineering Division. This permit can be applied for online at pw.everettwa.gov and requires a traffic <br />control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of <br />application. <br />12. This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 25-Site Final/Permit <br />Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br />Public Works Permit Fee Breakdown: <br />Retaining wall in the ROW ................................. $40.00 <br />Misc. Minor Permits (Drainage Work) ............... $25.00 <br />PW Site Inspection ............................................. $20.00 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant <br />hereby agrees to hold and save harmless the City of Everett from any <br />% 05/26/2021 and all claims for damages, costs, expenses, or causes of action that <br />may arise because of installation and maintenance of the <br />improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace <br />Approved for Construction, Public Works Dept. Date public property damaged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAYBE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.