My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1127 OLYMPIC BLVD 2024-03-27
>
Address Records
>
OLYMPIC BLVD
>
1127
>
1127 OLYMPIC BLVD 2024-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 10:20:05 AM
Creation date
3/16/2024 10:58:57 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
1127
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment F: 1-3.1 <br /> Figure 1-3.2: Flow Chart for Determining Requirements for <br /> Redevelopment <br /> Does the Project result in 2,000 square feet, or more, of new plus replaced hard surface area? <br /> OR <br /> Does the land disturbing activity total 7,000 square feet or greater? <br /> IF Yes No <br /> Minimum Requirements#1 through#5 <br /> apply to the new and replaced hard Minimum Requirement#2 applies. <br /> surfaces and the land disturbed. <br /> Next Question <br /> Does the Project add 5,000 square feet or more of new hard surfaces? <br /> OR <br /> Convert 3/4 acres or more of vegetation to lawn or landscaped areas? <br /> OR <br /> Convert 2.5 acres or more of native vegetation to pasture? <br /> Yes No) <br /> All Minimum Requirements apply Next Question Is this a road <br /> to the new hard surfaces and the 110 related project? No <br /> converted vegetation areas. <br /> Yes <br /> Does the Project add 5,000 square feet or more of new hard surfaces? <br /> YesIs the total of new plus replaced hard surfaces 5,000 <br /> No square feet or more, <br /> Do the new hard AND <br /> surfaces add 50%or does the value of the proposed improvements- <br /> more to the existing No No additional No including interior improvements-exceed 50%of the <br /> hard surfaces within requirements. - assessed value(or replacement value)of the: <br /> the Site? • existing Project Site improvements(for <br /> commercial or industrial projects)OR <br /> • existing Site improvements(for all other projects) <br /> YesL All Minimum Requirements apply to the new and replaced <br /> hard surfaces and converted vegetation areas. Yes <br /> Flow Chart for Determining Requirements for <br /> Redevelopment <br /> Revised March 2019 <br /> DEPARTMENT OF <br /> ECOLOGY Please see htfpJ/www.ecy.wa.gov/copyright.html for copyright notice including permissions, <br /> State of Washington limitation of Ilablllty,and disclaimer. <br /> 2019 Stormwater Management Manual for Western Washington <br /> Vohtme 1- Chapter 3-Page 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.