My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1127 OLYMPIC BLVD 2024-03-27
>
Address Records
>
OLYMPIC BLVD
>
1127
>
1127 OLYMPIC BLVD 2024-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 10:20:05 AM
Creation date
3/16/2024 10:58:57 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
1127
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 1. DETERMINE APPLICABILITY <br /> Use the criteria below to determine if this template may be used for your project. If any <br /> criteria below are marked "False," this template may not be used and a report meeting <br /> Minimum Requirements#1-9 is required and shall be prepared by a professional Engineer <br /> 0 licensed in the State of Washington. <br /> Criteria <br /> This project will create 2,000 square feet (ft') or more,but less than 5,000 ft2, <br /> of new plus replaced hard surface area OR will have 7,000 ft2 or greater of land <br /> disturbing activities. <br /> r This project does not drain to the combined sewer. <br /> 7 This project converts less than 3/4 acre of existing soil cover or vegetation to <br /> lawn or landscape areas. <br /> This project will not adversely impact a water of the state. <br /> 7 This project will not change a natural drainage course and will not generate any <br /> new concentrated flows leaving the site. <br /> This project will not be constructed within a critical area or a critical area buffer <br /> and will not adversely impact a critical area. See the City of Everett Municipal <br /> Code,Title 19.37. <br /> This project will follow the SWMMWW design criteria to satisfy Minimum <br /> Requirement #5 rather than an engineered design. <br /> What are the minimum technical requirements(MR)for a small project? <br /> ■ MR#1: Preparation of a Stormwater Site Plan (Report and Plans) <br /> ■ MR#2: Construction Stormwater Pollution Prevention Plan (SWPPP) <br /> ■ MR#3: Source Control of Pollution <br /> ■ MR#4: Preservation of Natural Drainage Systems and Outfalls <br /> ■ MR#5: On-Site Stormwater Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.