My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4101 RUCKER AVE 2024-03-29
>
Address Records
>
RUCKER AVE
>
4101
>
4101 RUCKER AVE 2024-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 10:29:34 AM
Creation date
3/16/2024 11:01:21 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4101
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 7/20/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2107-041 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> E V E R E T T <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $85.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> AEROTECH ENVIRONMENTAL CONSULTING INC NICK GERKIN <br /> 14220 INTERURBAN AVE 5,STE 116 <br /> TUKWILA,WA,98168 <br /> PHONE:2064822287 PHONE:2064822287 <br /> TAX PARCEL ID#:00582101500300 SITE ADDRESS:4101 RUCKER AVE <br /> DESCRIPTION: INSTALL GROUNDWATER MONITORING WELLS IN ROW OF 41ST ST <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Traffic Control must be done in accordance with MUTCD Standards and the Traffic Control Plan approved by City of Everett. <br /> S. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 6.Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614,or as directed by the City PW <br /> Inspector. Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 7. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Inspections are required for job start notification, potholing all City utilities,evaluation of traffic <br /> control set-up,to view the work prior to backfill,and after final restoration to final the permit. <br /> 8. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 9.This permit approved for work within the Right of Way only. <br /> Public Works Permit Fee Breakdown: <br /> Paving..............................................$45.00 <br /> PW Plan Review..............................$20.00 <br /> PW Site Inspection.........................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> n may arise because of installation and maintenance of the <br /> /evre Pow 0?/22/2021 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.