My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1319 PINKERTON AVE 2024-03-29
>
Address Records
>
PINKERTON AVE
>
1319
>
1319 PINKERTON AVE 2024-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 7:46:17 AM
Creation date
3/16/2024 11:32:48 AM
Metadata
Fields
Template:
Address Document
Street Name
PINKERTON AVE
Street Number
1319
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) for <br /> Single Family Residential / Duplex / Small Projects <br /> This Small Project Construction Stormwater Pollution Prevention Plan (SWPPP) provides a simplified <br /> template to assist small projects in meeting the City of Everett's erosion and sedimentation control <br /> requirements. <br /> This template is for projects not triggering a drainage report (installing less than 2000sf of new plus <br /> replaced hard surfaces in the separated stormwater basins), as projects that do trigger a drainage report <br /> will have a SWPPP section included within the drainage report. <br /> Project Site Information <br /> Project name: Pinkerton Rockery <br /> Project address: 1319 Pinkerton Ave Permit number: PW2111-058 <br /> Prepared by: Clint Russell Date: 01/07/22 <br /> Primary contact name: Primary contact phone: 2069637391 <br /> Primary contact email: Clint-russell@aol.com <br /> Reserved for City of Everett Public Works Approval Stamp <br /> City of Everett <br /> EVERETT Reviewed for Permit 01/19/2022 <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters.AConstruction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP)is designed to be a stand-alone document that addresses construction stormwater <br /> managementconcerns.Acopy of this SWPPP is required to be kept bythe contractor performingthework at <br /> the jobsite for reference and updated during the duration of construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.