Laserfiche WebLink
Task 1: Describe the project during construction <br /> Nature and purpose of the construction project: <br /> Repair portions of existing sidewalk that have broken down <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roadsthat <br /> might be affected by the construction project: <br /> This project will only shut down the sidewalk surrounding the residence <br /> How upstream drainage areas may affect the site: <br /> No anticipated issues with drainage <br /> Downstream drainage leading from the site to a receiving body of water: <br /> No anticipated drainage necessary from the site to a receiving body of water <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> Not applicable <br /> Special requirements and provisions for working near or within critical areas: <br /> We have felt inserts for sewer drains in case of rainfall, but we plan to be on site to <br /> pour when there is no rain forecasted <br /> Areas on the site that have potential erosion problems: <br /> Not applicable <br /> Locations where surface water leaves the site: <br /> curb areas around sidewalk <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 2 of 6 <br /> (SWPPP) Template for Small Projects <br />