Laserfiche WebLink
Element 12. Manage the Project: Keep quantities of <br /> rials On Hand erosion prevention and <br /> ElBMPC160:Certified Erosion and Sediment on r sediment control <br /> (CESCL not required on-site for sites<1acre) materials on the project <br /> site at all times. <br /> ❑ BMP C162:Scheduling <br /> ❑ OtherPertheSWMMWW: <br /> - f Not applicable to my proposed project ,( ,( ,1 sir <br /> Explain: Coni �i"1rC.� �'c4�v1�J 4 �ntJ Cie <br /> CQ(-N Crf_� ped J <br /> Element 13. Protect low impact development: <br /> ❑ BMP C102: BufferZones <br /> ❑ BMP C103:High Visibility Plastic or Metal Fence <br /> ❑ BMP C200:Interceptor Dike and Swale <br /> ❑ BMP C207:CheckDams <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ BMP C231: BrushBarrier <br /> ❑ BMP C233 SiltFence <br /> ❑ BMP C 234:Vegetated Strip <br /> ❑ OtherPertheSWMMWW: <br /> t <br /> applicable to my proposed projectQ �,,^ �},lain: CX'f� qCk wCG1 AND Stde. �X ft, <br /> ccxn CXttc, 00 . <br /> Task 3: Construction SWPPP drawings <br /> Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> 2 Show on yourTESC 9nal BMPsselected above to satisfy the 13 Elements on your <br /> TESC Plan. � <br /> M See City of Everett Public Works Standard Plan 103-TESC Plan Example <br /> everettwa.gov/DocumentCenter/View/7040 <br /> Note:Construction StormwaterPollution Prevention Plans(Construction SWPPPs)that <br /> involve engineering calculations must be prepared by or under the direction of a <br /> Washington State professional licensed engineer. <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan <br /> (SWPPP) Template for Small Projects 6 of 6 <br />