Laserfiche WebLink
Task 1: Describe the project during construction <br /> .0 Nature and purpose of the construction project: <br /> -To �Fiti� �n 1o�rtge. voc1 -: SmcU,t Cd- <br /> \OYtiov 5 <br /> 120(X- Lon, CUJ_(a. . <br /> to CA 5 � <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that <br /> might be affected by the construction project: <br /> ;2 <br /> How upstream drainage areas may affect the site: <br /> Downstream drainage leading from the site to a receiving body of water: <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> Special requirements and provisions for working near or within critical areas: <br /> Areas on the site that have potential erosion problems: <br /> Locations where surface water leaves the site: <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan <br /> (SWPPP) Template for Small Projects 2 of 6 <br />