Laserfiche WebLink
SW 1/4,SEC.20, T.29 N.,R.05 E., W.M. <br /> SNOHOMISH COUNTY, WASHINGTON TESC&GRADING NOTES <br /> -------------------- x r--------- 1 OTHER CONSTRUCTION. <br /> EROSION <br /> CONTROL SYSTEM/ ------------------I------ SHALLINSTALLED L <br /> a ------------f/J/7T/T/T 7T/T/T❑/T/T/�T/T/T/� X X x X <br /> WOOD FENCE I 2. WHERE POSSIBLE,MAINTAIN NATURAL VEGETATION FOR SILT CONTROL. <br /> a / <br /> 3. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE,THE <br /> EX. WM EROSION CON ROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS <br /> d HOUSE \\\ <br /> REQUIRED <br /> BY THE <br /> CITY <br /> ENGINEER <br /> L.TO ENSURE CONTINUING <br /> (TBR. SERVICE TO BE <br /> CAPPED AT MAIN BY CITY a #2609 \\ x 4 PERIODS OALL BEMARCHAI TO MAYS THAT IL15BANDEFT FOR AUGUST 19 70 OCTOBERDAYS OR RI SHALLGBEEE <br /> OF EVERETT CREW AT IMMEDIATELY SEEDED WITH A MIX AND BY A METHOD APPROVED BY THE CITY OF <br /> � d a i I L / \\\ i EVERETT PUBLIC WORKS DEPARTMENT AND MAINTAINED UNTIL SEED GERMINATION <br /> VVV IS ASSURED.IN ADDITION TO SEEDING,SLOPES OF 259°OR GREATER WILL BE <br /> DEVELOPER'S EXPENSE PER MULCHED WI H 2.0 TONS OF STRAW PER ACRE,OR WITH AN APPROVED EQUAL. <br /> ❑L/�/��/�/1 L/��/L/��(�/�/1�J \ DURING THE REST OF THE YEAR,TEMPORARY SOIL STABILIZATION MUST BE <br /> COST ESTIMATE) (TYP.) I APPLIED IMMEDIATELY TO DISTURBED AREAS THAT WILL BE LEFTEXPOSED FOR 7 <br /> N 89°59'54 W 120.01 DAYS OR MORE,AND IMMEDIATELY TO SLOPES GREATER THAN 253 WILL BE LEFT <br /> EXPOSED FOR 3 DAYS OR MORE. <br /> ) 5. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN.TRACKING OF MUD AND SCALE: 1��= 10' <br /> �VE��G DEBRIS FROM THE SITE WILL NOT BE ALLOWED FAILURE TO COMPLY WITH THIS/ / HOUSE VEG CONDITION WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br /> /BLOCK WA6 6. GRADING OUTSIDE CIN RIGHT-OF-WAY SHALL CONFORM TO CHAPTER 70, 10 5 0 LO 20 <br /> 2611 OCK TRENCH & FRENCH DRAIN I UNIFORM BUILDING CODE. <br /> 40' a I / 114' T.O.W., 1 1 1' B.O.W. MU I THE 13 ELEMENTS OF TESC <br /> d (TBR) TRA R ED AREA IF NEEDED x 7. COMPACT ALL Flus TO MINIMUM 953 MAXIMUM DENsrrr. <br /> X. R/Il1/ I d / 6 CEDAR FENCE �1 I ELEMENT 11-MARK CLEARING LIMITS: <br /> n 8. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. <br /> COLLECTION FACILITIES TO INSURE THAT SEDIMENT LADEN WATER DOES NOT BMP C103 <br /> `� 1 I u • / I ENTER THE NATURAL DRAINAGE SYSTEM.AS CONSTRUCTION PROGRESSES AND <br /> UNEXPECTED(SEASONAL)CONDITIONS DICTATE,MORE SILTATION CONTROL ELEMENT,q2-ESTABLISH CONSTRUCTION ACCESS: <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> I I/ <br /> FACILITIES MAY E REQUIRED TO INSURE COMPLETE SILTATION CONTROL OF THE THE EXISTING PAVED ENTRANCE WILL FUNCTION AS THE STABILIZED <br /> j a 14 PROPOSED PROJECT THEREFORE,DURING THE COURSE OF CONSTRUCTION IT CONSTRUCTION ENTRANCE <br /> DECK <br /> _ E DECK _--- EC' p� SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO <br /> ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO ELEMENT J3-CONTROL FLOW RATES: <br /> I / PROVIDE ADDITIONAL FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT FLOW IS MINIMAL. <br /> PROPERTIES. NO BMP's ARE PROPOSED. <br /> /77 <br /> 9. CONTRACTOR SHALL PROTECT THE SEWER MAIN DURING CONSTRUCTION. ELEMENT�4-INSTALL SEDIMENT CONTROLS: <br /> NO BMP'S AR <br /> L'i E PROPOSED <br /> \ / 1 ♦ / 6 11B z ELEMENT,q5-STABILIZE SOILS: <br /> a a a ,./ L_ SOIL STABILIZATION IS ACHENED BY PLASTIC COVERING,MULCHING&SEEDS <br /> \\ // EI a _ ECK� M(f T R 30 UNI / MU T O Q TESL NOTES ELEMENT 16-PROTECT SLOPES <br /> \ / I T 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL(ESC)PLAN DOES NOT CONSTITUTE AN NO BMPS ARE PROPOSED. <br /> \ d.. I I/_A APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN(E.G.SIZE AND LOCATION OF ROADS, ELEMENT J/7-PROTECT DRAIN INLETS: <br /> V /'1 z PIPES,RESTRICTORS,CHANNELS,RETENTION FACILITIES,UTILITIES). NO BMPS ARE PROPOSED. <br /> EX. WM - TBR DECK \ 2. THE IMPLEMENTATION OF THESE ESC PIANS AND THE CONSTRUCTION,MAINTENANCE, ELEMENTJ8-STABILIZE CHANNELS AND OUTLETS: <br /> \ .. —— —�—— ——— —— — —— — —— — —— _— — —— — — — _ __ _ _ ________ REPLACEMENT,AND UPGRADING OF THESE ESC FACILITES IS THE RESPONSIBILITY OF THE N/A. <br /> \ / _ d f ZLI APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND NO BMP's ARE PROPOSED. <br /> VEGETATION/L NDSCAPING IS ESTABLISHED. <br /> \ / 5 X5 \ ALLEY ELEMENT 19-CONTROL POLLUTANTS: <br /> J. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY ALL VEHICLES,EQUIPMENT AND PETROLEUM PRODUCT STORAGE/DISPERSING AREAS <br /> \ / PLANTER 1 - + FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION DURING THE CONSTRUCTION PERIOD,NO WILL BE INSPECTED REGULARLY TO DETECT ANY LEAKS OF SPILLS,AND TO <br /> a I DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED.THE FLAGGING IDENTIFY MAINTENANCE NEEDS AND PREVENT LEAKS OF SPILLS. <br /> / BOX (TYP.) -: Iw+ +o S- ECLFT <br /> SED EVERETT SALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION BMP's C151,C152&C153. <br /> OF CONSTRUCTION <br /> .a 1 PARKING RAGE ELEMENT 110-CONTROL DEWATERING: <br /> a z. y 1 n / / 4. THE ESC FACILIPES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTON WITH ALL THERE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION PROJECT. <br /> T T CLEARING AND GRADING ACTIVITIES,AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND NO BMP's ARE PROPOSED. <br /> /+ VOL. <br /> /O I ��• �� SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM,ROAU.1 OR NOLATE <br /> _ I I �/ I— APPLICABLE WATER QUALITY STANDARDS. <br /> d 9 ELEMENT III-MAINTAIN BMP"s: <br /> 5. THE ESC FACILITES SHOWN ON THIS PIAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED ALL TEST BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED. <br /> " HOLSE BMA's C150&C160. <br /> Q I I / SITE CONDITIONS DURING THE CONSTRUCTION PERIOD,THESE ESC FACILITES SHALL BE <br /> / ,(I� UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND <br /> z d •,•, DECK 2617 / DE I, SEDIMENT-!ADEN WATER W NOT LEAVE THE SITE ELEMENT J12-MANAGE THE PROJECT <br /> " a I 1 I THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION OF THE AREA <br /> MU <br /> ----- MU — — -- — -- — -- — — -- — -- — -- — — — — -- — --� -------- 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN SEDIMENT CONTROL. <br /> cr rt' APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING.ESPECIALLY AFTER STORM BMPS C705,C760&C762. <br /> !LAN INC r /I 7. MEESCFACILITES ON INACTIVE SI7ES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF FROM ELEME RONT OFS AND OTHER T ARDS SURFACES. <br /> ITE WATER MANAGEMENT BMP'S FOR RUNOFF <br /> II N T ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT N/A <br /> HAI 8 AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A <br /> TRAPPED CATCH ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO <br /> pp PAVING.THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT UDEN WATER INTO THE 7'�'S'C'j'EGEND <br /> DECK / I DECK ( D!\ DOWNSTREAM SYSTEM. INTERCEPTOR TRENCH W/ <br /> d ❑ — 111 l/ I7 9, STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF ROCK CHECK DAM <br /> / _ a I• ,•, •,,, t ,`,•,,,•,•, CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT ADDITIONAL MEASURES <br /> • - • • ••••••• •• ••• •• •• ••• •• • - ••••• J MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF <br /> EX. 3/4 WM (TO BE .•. L•-�•• . 6i SF 5F. .'. : F•".`. F SF .�. . . <br /> $f . . -�• .`. Q HE PROJECT. -SF SF-SILT ENCS <br /> _ _ <br /> ----- <br /> ✓I 10. THE CONTRACTOR$HALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT <br /> USED FOR IRRIGATION) o BLOCK WALL =--I TRACKED OFF THE SITE <br /> ❑ (TBR. DISCONNECT ALL a - 114 T.O.W., 111' B.O.W.-- ---- 7 <br /> _------tr=_ -- -a I ------ APPROPRW E MEASURES SHA L BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WA ER TEMPORARY CONSTRUCTION <br /> ---- — -- — — -- — r <br /> BODIES IF THE PROPOSED BMPS FAIL. ENTRANCE <br /> WATER LINES AT THE o BLOCK WALL D❑K / DECK'/ 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO <br /> r/ MORE THAN 2 DAYS FROM OCTOBER i THROUGH APRIL 30,AND FOR NO MORE THAN 7 DAYS CATCH BASIN INSERT <br /> PROPERTY LINES AT THE 114' T.O.W., PER 19.40.010 3eK FRENCH / FROM MAY i THROUGH <br /> SEP EMBER 30 PROTECTION(TOP.) <br /> WATER METER PRIOR TO 1 1 1' B.O.W. 6' CEDAR FENCE DRAIN IN'TRAPPED AREA <br /> / DEMO.) (TYP.) 1 O IF NEEDED \ ' V c� GLEIRI16 LIMITS <br /> b a CONTRACTOR RESPONSIBILITY FOR EROSION/SILTATION CONTROL ❑ <br /> 1 30 UNITS \� / I�/ IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM WATER RUNOFF BE <br /> / EX. WM 4 STORIES I I/ CONTROLLED CALL TIMES 0 PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY ANY AND ALL (j VEGETATION <br /> W I � I O IIYY//// MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. <br /> I. REGARDLESS OF SITE,WEATHER,SOIL OR OTHER CONDITIONS,THE CONTRACTOR SHALL BE FULLY <br /> f I i ux TYPE V-A / / '^ RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR <br /> add --- --- —��----------------���---------------------/ ----------- ---- / ----- , —�`��/1 SILT-UDEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK,STREAM,WETLAND OR MII MULCH&/OR STRAW MATTING <br /> / 77 WATER BODY ON THE SITE <br /> DECK L l 2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN,THE CONTRACTOR SHALL BE RESPONSIBLE <br /> FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS,"BEST MANAGEMENT PRACTICES"(BOPS),FOR PL PLASTIC COVER <br /> STORM WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE <br /> d � DEPARTMENT OF ECOLOGY AND THE CITY OF EVERETT. <br /> THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER FLOW ARROW(EX.) <br /> C / AND THE CITY INSPECTOR IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE <br /> I - INEFFECTIVE AT CONTROLLING EROSION AND SILTATION,THE CONTRACTOR SHALL IMMEDIATELY REPORT TO <br /> W S-2 ENCLOSED / N AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY.ALL CONSTRUCTION <br /> PARKING` GARAGE / ACTIVITIES,WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES,SHALL CEASE UNTIL <br /> V SUCH TIME AS THE WATER QUALITY IS BROUGHT UNDER CONTROL. <br /> 24 PARKING STALLS 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM <br /> r T ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER. <br /> / " 5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE AND SHALL <br /> W __ ___ — ---------------------------------- -------------------- ------ CK <br /> ________ BE IMMEDIATELY AVAILABLE FOR USE SUCH SUPPLIES AND MATERIALS SHALL INCLUDE,BUT NOT BE LIMITED <br /> � I( t DECK TO,STRAW BALES OR OTHER MULCHING MATERIAL,SILT FENCING AND STAKES,FILTER FABRIC,ETC <br /> d I & DURING AND AFTER RUNOFF PRODUCING STORM EVENTS,CONTRACTOR SHALL MONITOR ALL EROSION INSIGHT ENGINEERING CO. <br /> 1 CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION <br /> \ a CONTROL MEASURES ABOVE ALL OTHERS. P.O.BOX-1478 <br /> v v EVERETT,WA 98206 <br /> O \ dv (425)303-9363 (425)303-9362 FAX <br /> 12 <br /> EX. 6" SIDE SEWER INF0@EVSIGHTENG1NEER1Nc.NET <br /> \ I SITE ADDRESS: 2611,2613,2617 <br /> \ r DECK DECK DECK DECK ROCKEFEL ER AVE. <br /> \ / 40 d a d, I / ; REV.N0, DESCRIPTION INITIALS DATE EVERETT,WA 98201 <br /> o TAX ACCOUNT NO.'S: 00439161000600,00439161000700, <br /> \ I - <br /> \ EX. R/ 00439161000800, <br /> a » / <br /> -------------------------- - --------------- <br /> / VTILI7T'C0NT9CTN0TE: Knowwharsbelow. 11 R. <br /> 12"/ I \` CAUTION. Call before you dig. ti w°F wnsgi��C SW 1/4,SEC.20,T.29X,R.05E,W.M. <br /> a EX. WM 16' C THE CONTACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, hQ ROCKEFELLER SQUARE-PHASE 2 <br /> \ / l• /ll /1 I DIMENSION,AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br /> \\ -_d BLOCK WALL // / ANDPLAVERRNOT.BY CAL LOCATIIONHPRIING OR TOE UTILITIES AND CONSTRUCTION.THIS SHALL INCLUDENG THE Q DWG FlLEAME DESIGNED BY: DATE SCALE JOB NO.: <br /> Q CALLING UTILITY LOCATE®1-800-424-5555 POTHOLING ALL OF THE EXISTING A 3649 w SyV 201086-PRELIM.DWG DNK I2 09 2020 1"=10, 20-1086 <br /> \\ / 113 T.O.W., 111' B.0.W. 3// / N 18 WHETHER ORLNOT TICONFICTS EEXIST.L CATION SINOF SAID PUTILIIES AS ESHOWN ASTONAL SHEET <br /> aOIL AT TY <br /> / N ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND <br /> ARE SUBJECT TO VARIATION.IF CONFLICTS SHOULD OCCUR,THE CONTRACTOR 09/24/2021 GRADING AND TESC PLAN C2°0 <br /> SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL <br /> PROBLEMS PRIOR TO PROCEEDING WHH CONSTRUCTION. <br />