Laserfiche WebLink
SECTION II: SITE ASSESSMENT <br /> Based on the site reconnaissance and the available topography we have the following info: <br /> • Topography: The topography of the site shows a 4 to 6-ft fall to the east. Refer to the <br /> grading plan for more details. <br /> • Drainage: The majority of the site drains to the east. <br /> • Soils: Per SCC survey of Snohomish County, the project site contains Alderwood <br /> Urban Land Complex 2 to 8 percent. Refer to the attached soil map later in this report. <br /> • Ground Cover: The entire site exists as residential property with individual homes on <br /> each parcel. <br /> • Critical areas: There are no critical areas located within the site. <br /> • The access to the site will be from the alley in between Rockefeller and Oakes Ave. <br /> Insight Engineering Co. - Stormwater Site Plan 12/30/20 <br /> -7 - <br />