My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2611 ROCKEFELLER AVE 2024-03-27
>
Address Records
>
ROCKEFELLER AVE
>
2611
>
2611 ROCKEFELLER AVE 2024-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 7:34:07 AM
Creation date
3/18/2024 11:06:33 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2611
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the required setbacks. Downspout Dispersion is infeasible because the site cannot provide <br /> the required vegetated flow paths. Perforated stub out connections are also not feasible. <br /> The runoff from the roof will be tight lined to a detention system on the south side of the <br /> project to continue to City's combined sewer system. <br /> 1. The purpose of this SWPPP is to describe the proposed construction <br /> activities and all temporary and permanent erosion and sediment <br /> control (TESL) measures, pollution prevention measures, <br /> inspection/monitoring activities, and recordkeeping that will be <br /> implemented during the proposed construction project. The <br /> objectives of the SWPPP are to: <br /> 2. Implement Best Management Practices (BMPs) to prevent erosion <br /> and sedimentation, and to identify, reduce, eliminate or prevent <br /> stormwater contamination and water pollution from construction <br /> activity. <br /> 3. Prevent violations of surface water quality, ground water quality, or <br /> sediment management standards. <br /> 4. Prevent, during the construction phase, adverse water quality <br /> impacts including impacts on beneficial uses of the receiving water <br /> by controlling peak flow rates and volumes of stormwater runoff at <br /> the Permittee's outfalls and downstream of the outfalls. <br /> 5. This SWPPP was prepared using the Ecology SWPPP Template. <br /> This SWPPP was prepared based on the requirements set forth in the <br /> Construction Stormwater General Permit and in the Stormwater <br /> Management Manual for Western Washington (SWMMWW 2014). <br /> The 13 BMP Elements <br /> Element#1 —Mark Clearing Limits <br /> To protect adjacent properties and to reduce the area of soil exposed to <br /> construction, the limits of construction will be clearly marked before land- <br /> disturbing activities begin. <br /> Element#2—Establish Construction Access <br /> Construction access or activities occurring on unpaved areas shall be minimized, yet where <br /> necessary, access points shall be stabilized to minimize the tracking of sediment onto <br /> Insight Engineering Co. - Stormwater Site Plan 12/30/20 <br /> - 15 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.