My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3303 WAVE DR 2024-04-12
>
Address Records
>
WAVE DR
>
3303
>
3303 WAVE DR 2024-04-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2024 10:42:27 AM
Creation date
3/19/2024 9:37:17 AM
Metadata
Fields
Template:
Address Document
Street Name
WAVE DR
Street Number
3303
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2301-033 Description:SFR-INSTALL SHOWER PAN <br /> Applied: 1/27/2023 Approved: 1/27/2023 Site Address: 3303 WAVE DR <br /> Issued: 1/27/2023 Finaled:4/21/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant: ELIZAROV DENIS <br /> Parent Permit: B2208-001 Owner: ELIZAROV DENIS <br /> Parent Project: Contractor: KI REMODELING LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/1/2023 2/1/2023 PLUMB 06-SHOWER JASON <br /> PAN MORRISSEY <br /> Notes: <br /> -Permit is attached to property set up on SRC inspections. <br /> PLUMB-SITE JASON RESCHEDULE <br /> 2/21/2023 2/21/2023 READINESS MORRISSEY ONLINE <br /> RECHECK <br /> Notes: <br /> denis.elizarov@gmail.com <br /> -Dennis called to cancel SRC inspection for today.He will reschedule when ready. <br /> PLUMB-SITE JASON <br /> 2/28/2023 2/28/2023 READINESS MORRISSEY READY <br /> RECHECK <br /> Notes: <br /> denis.elizarov@gmail.com <br /> 2/28/2023 2/28/2023 PLUMB 06-SHOWER JASON APPROVAL see notes <br /> PAN MORRISSEY <br /> Notes: <br /> -Shower pan test ok. <br /> PLUMB-SITE JASON <br /> 4/11/2023 4/11/2023 READINESS MORRISSEY READY <br /> RECHECK <br /> Notes: <br /> denis.elizarov@gmail.com <br /> 4/11/2023 4/11/2023 PLUMB 08-FINAL JASON APPRVD-PERMIT see notes <br /> MORRISSEY FINAL <br /> Notes: <br /> -New mud set shower pan only.No new valve or drain. <br /> I <br /> Printed: Friday, 21 April,2023 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.