Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />Correction made. Walls are insulated (r-15 and some r-23) and continuous insulation (r-6) at exterior of walls. Pictures provided for slab insulation. 2" <br />r-13 insulation. Ok to drywall mud and tape. Will verify perimeter foundation wall insulation at final. <br />Correction made. Walls are insulated (r-15 and some r-23) and continuous insulation (r-6) at exterior of walls. Pictures provided for slab insulation. 2" <br />r-13 insulation. Ok to drywall mud and tape. Will verify perimeter foundation wall insulation at final. <br />PERMIT EXTENSION <br />11/1/2023 <br />11/1/2023 <br />(REASON <br />SHARON <br />EXTENSION <br />eTRAKiT Inspection Request <br />REQUIRED) <br />GILFEATHER <br />APPROVED <br />Notes: <br />10/31/2023 8:18 PM Andrew Sharp <br />construction delays <br />Contact Name: Andrew Sharp <br />Site Address: 5404 S 3RD AVE <br />Phone:2063557302 <br />e-Mail: Sharp_Shark2010@frontier.com <br />12/19/2023 <br />12/19/2023 <br />BLDG 12- <br />RAKEEB KHAN <br />APPROVAL <br />INSULATION <br />Notes: <br />Provided photos of exterior wall insulation. Foundation wall is now covered. <br />12/19/2023 <br />12/19/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />APPRVD-PERMIT <br />eTRAKiT Inspection Request <br />FINAL <br />Notes: <br />12/8/2023 8:43 AM Andrew Sharp <br />Contact Name: Andrew Sharp <br />Site Address: 5404 S 3RD AVE <br />Phone:2063557302 <br />e-Mail: Sharp_Shark2010@frontier.com <br />12/20/2023 <br />CERTIFICATE OF <br />Permit Technician <br />OCCUPANCY <br />Notes: <br />I <br />Printed: Wednesday, 20 December, 2023 4 of 4 rk <br />SUPERION <br />