My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5404 S 3RD AVE 2024-03-29
>
Address Records
>
S 3RD AVE
>
5404
>
5404 S 3RD AVE 2024-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 11:10:40 AM
Creation date
3/19/2024 11:05:08 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
5404
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: E2101-079 <br />Applied: 1/15/2021 <br />Issued: 1/19/2021 <br />Status: FINALED <br />Parent Permit: B2108-017 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:1/15/2021 <br />Finaled: 10/30/2023 <br />Description: UPGRADE 400A SVC/ INSTALL 2X200A MAIN PANELS/ 60A <br />GENERATOR <br />Site Address: 5404 S 3RD AVE <br />City, State Zip Code: EVERETT, WA 98203-4142 <br />Applicant: <NONE> <br />Owner: TAPPER AMY & SHARP ANDREW CLARK <br />Contractor: OWNER <br />Details: <br />SUB PANEL/ 125A GARAGE SUB PANEL/ 100A SHED SUB PANEL/ REWIRE BRANCH/ WEST BEDROOM / LAUNDRY ROOM, KITCHEN / <br />WIRE BRANCH IN SHED AND GARAGE <br />UPGRADE 400A SVC/ INSTALL 2X200A MAIN PANELS/ 60A GENERATOR <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />1/20/2021 <br />1/20/2021 <br />ELEC 05-SERVICE <br />STEVE BANKS <br />NOT READY <br />eTRAKiT Inspection Request <br />Notes: <br />1/19/2021 3:06 PM Andrew Sharp <br />Discuss proper install of 200A disconnects and location of main bonding jumper <br />Contact Name: Andrew Sharp <br />Site Address: 5404 S 3RD AVE <br />Phone:2063557302 <br />e-Mail: Sharp_Shark2010@frontier.com <br />(1/20/2021 8:31 AM SKB) <br />Nothing to inspect. <br />6/29/2021 <br />6/29/2021 <br />PERMIT EXTENSION <br />KATHY COLLISON <br />EXTENSION <br />COVID EXTENSION <br />APPROVED <br />Notes: <br />10/27/2021 <br />10/27/2021 <br />ELEC 05-SERVICE <br />STEVE BANKS <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />10/26/2021 12:40 PM Andrew Sharp <br />Contact Name: Andrew Sharp <br />Site Address: 5404 S 3RD AVE <br />Phone:2063557302 <br />e-Mail: Sharp_Shark2010@frontier.com <br />(10/27/2021 3:09 PM SKB) <br />The grounding electrode conductor must land on the grounded bus or install a wire of proper size by the service <br />entrance conductors serving that panel. <br />I <br />Printed: Thursday, 02 November, 2023 1 of 4 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.