Laserfiche WebLink
SB IV ADHESIVE <br /> STORAGE AND HANDLING: 2. Roof Deck and Parapet <br /> • Protect SB IV from freezing. a. Using a 3/8-inch (medium)nap solvent-resistant <br /> • SB IV must not be shipped in temperatures less roller,apply SB IV evenly at a coverage rate of <br /> than 40° F(5° C). 120 square feet per gallon, per surface,to <br /> BOTH the backside of the membrane and to the <br /> • Store SB IV between 60° F(16°C)and 80° F(27° substrate.This gives a net coverage rate of 60 <br /> C),out of direct sunlight,for maximum shelf life. square feet per gallon. The coverage rate will <br /> Shelf life is one year in an unopened pail,from vary depending upon the porosity of the <br /> date of manufacture printed on the pail,when substrate. <br /> following these recommended storage procedures. <br /> b. Allow SB IV to dry(approximately 5—10 <br /> PRECAUTIONS: minutes)until it does not stick or form strings <br /> when a dry finger is pushed into it and removed. <br /> • Read Safety Data Sheets(SDS)prior to using. Dry time will vary according to weather <br /> •Wear proper personal protective equipment, such conditions. <br /> as gloves and eye protection, per the SDS. c. Open time, prior to adhering the membrane to <br /> • Combustible. Do not expose to heat,flame or the substrate, may extend up to 60 minutes <br /> sparks. Do not smoke while applying. depending on weather conditions. However, the <br /> • Use only in well ventilated areas and avoid installer is urged to apply the membrane to the <br /> breathing vapors. substrate as soon as the SB IV is ready. <br /> • Keep pail closed when not in use. d. Roll the SB IV-coated membrane onto the <br /> •When transferring SB IV between pails, ensure that SB IV-coated substrate slowly and evenly to <br /> both pails are grounded. avoid trapping air and to minimize wrinkles. <br /> •Treat empty pails with caution since they may e. Apply pressure, by means of a heavy roller or <br /> contain flammable vapors. push broom,to ensure proper bonding. <br /> f. Refer to the Duro-Last Adhered Systems <br /> INSTALLATION: Y <br /> specification for guidelines regarding membrane <br /> 1. General installation. <br /> • Do not exceed Open Time of 1 hour. <br /> •Apply to surfaces which are clean, smooth, dry and <br /> free of oil and grease. <br /> • Only apply SB IV when the ambient <br /> temperature is at least 40°F(5°C)and rising. <br /> Adhesive must be stored between 60°F(15°C) <br /> and 80°F(26°C)for 24 hours prior to <br /> installation. <br /> • Stir SB IV vigorously, by hand,to achieve <br /> homogeneous mixture prior to application. <br /> •Thinning the SB IV is not allowed. <br /> • SB IV may not be used with fleece membranes. <br /> • Do not apply SB IV where hot-air welding will be <br /> performed. <br /> • Do not allow SB IV to contact expanded <br /> polystyrene(EPS)or extruded polystyrene <br /> (XPS). Damage to EPS and XPS will occur. <br /> Squeegees must not be used when EPS or XPS <br /> are within the roofing system. <br /> 12I21 <br /> www.duro-last.com 800 248-0.28Q <br /> Duro-Last,Duro-Tuff,Duro-Guard and'World's Best Roof'are registered trademarks owned by Duro-Last,Inc. <br /> Created:01/01/2009 Revised:04/07/2010,05/13/2015,07/20/2022 <br />