Laserfiche WebLink
=Menu _ 1 Search all of Digital Codes 0% <br /> J <br /> ,; Sign In 14► EH <br /> { <br /> • <br /> • Site soil coefficients now correspond to the newest generation of ground <br /> motion attenuation equations (seismic values). <br /> • Five-foot tall wood trusses requiring permanent bracing must have a periodic <br /> special inspection to verify that the required bracing has been installed. <br /> • New alternative fastener schedule for construction of mechanically laminatec <br /> decking is added giving equivalent power-driven fasteners for the 20-penny <br /> nail. <br /> • Solid sawn lumber header and girder spans for the exterior bearing walls <br /> reduce span lengths to allow#2 Southern Pine design values. <br /> About <br /> Contact Us <br /> Subscribe <br /> Legal <br /> CC Family of Solutions <br /> `,onnect With Us <br /> ',OPYRIGHT©2023 INTERNATIONAL CODE COUNCIL, INC. ALL RIGHTS RESERVED. <br />