Laserfiche WebLink
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) • PERMIT# SZ-1 3--U°.13 <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone (n <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use CIO I� r(, Q40�} <br /> El Route to Residential Building Residential Use J <br /> ❑ Make this a"W" Permit Proposed No.of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No. of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? DYes El No <br /> Number of Stories "In Lieu" Fee:Type: Amount$ <br /> Basement ❑No ❑Yes, Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group ❑Everett School Dist DMukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑U date Existing ❑News stem El Re d Park Impact Fee Total$ <br /> p p y q' p (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing New System Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: ❑ 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add!RCW 64.55 docs required prior to final? ❑Yes ❑No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ Additional <br /> looteess:r <br /> a4_CO <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: -PW Worksheet Needed if: <br /> ❑Sys Dev Eval(util/sw)❑Traffic Mit Eval <br /> Approved B Date: /�)/ -/- _DSite Work/Drainage ❑Address Letter <br /> DBackflow Prevention for high hazard: <br /> ;(dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT =supportive housing) <br /> Separate/Deferred Submittals Required: DRoute this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> fiLihis Permit is Approved by Public Works <br /> Fire Dept. Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑ A Separate PW Permit is Required(Permit#: PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder goin with this folderfor permit issuance) <br /> Approved By: Date: ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed B,r7„., Date:sl,t 6`202-3 <br />