Laserfiche WebLink
Task 1: Describe the project during construction <br /> Nature and purpose of the construction project: <br /> THE PROPOSED PROJECT IS FOR A DESIGN OF A SURFACE PARKING LOT. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roadsthat <br /> might be affected by the construction project: <br /> The project is located along the west side of Rockefeller Avenue and extends <br /> westerly to the adjacent alley. Access to the praking lot will be from the adjacent <br /> alley, no direct access to Rockefeller Avenue will be made. <br /> How upstream drainage areas may affect the site: <br /> Negligible. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> Stormwater runoff from the parking lot will be collected and discharge to the City of <br /> Everett's combined stormwater and sewer system in Rockefeller Avenue along the <br /> easterly boundary of the site. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> None. <br /> Special requirements and provisions for working near or within critical areas: <br /> None. <br /> Areas on the site that have potential erosion problems: <br /> None. <br /> Locations where surface water leaves the site: <br /> Stormwater runoff from the parking lot will be collected and discharge to the City of <br /> Everett's combined stormwater and sewer system in Rockefeller Avenue along the <br /> easterly boundary of the site. <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 2 of 6 <br /> (SWPPP) Template for Small Projects <br />