My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/03/20 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/03/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 3:46:03 PM
Creation date
3/21/2024 10:32:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Request for Final Acceptance & Certificate of Completion for the SEI to SRI Intertie SR08 Rehabilitation <br />Project <br />Council Bill # <br /> <br />Project: SEI to SRI Intertie SR08 Rehabilitation <br />Partner/Supplier: Allied Construction Associates, Inc. <br /> Location: 36th St and Eclipse Mill Road, Everett, WA 98201 <br />Preceding action: Contract Award-March 31, 2021 <br />Fund: 336-Water and Sewer Systems Improvement Fund <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 3/20/24 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: Change Order <br />No. 3 <br /> <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />425-257-8809 <br /> <br />Email: <br />THood@everettwa.gov <br />Initialed by: <br /> RS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br /> <br />Original Contract Amount: $ 994,985.50 <br />Final Contract Voucher Amount $1,107,267.40 <br /> <br />Project summary statement: <br />The general contractor, Allied Construction Associates, Inc. completed the SEI (South <br />End Interceptor) to SRI (Snohomish River Interceptor) Intertie & SR08 Rehabilitation <br />project in accordance with the project’s plans and specifications and to the satisfaction <br />of the Public Works Department. <br />The SEI to SRI are existing parallel, large-diameter pipes (48” and 72” diameter <br />respectively) extending from 36th St. to the Water Polllution Control Facility (WPCF) <br />including a crossing at the Snohomish River. This intertie connection enables City <br />Maintenance and Operations to perform repairs, inspection or maintenance of the 48” <br />SEI pipeline and enables other sewer conveyance improvements to be performed. <br />Recommendation (exact action requested of Council): <br />Accept the SEI to SRI Intertie & SR08 Rehabilitation Project as complete and authorize <br />the Mayor to sign the Certificate of Completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.