My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4010-24
>
Ordinances
>
Ordinance 4010-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:26:08 AM
Creation date
3/21/2024 11:26:03 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4010-24
Date
3/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ORDINANCE NO. 4010-24 <br />An Ordinance creating a special improvement project entitled “Walter E. Hall Park Community <br />Connections Path”, Fund 354, Program 094, to accumulate all costs for the project. <br />WHEREAS, <br />A.The City Council recognizes the need to maintain and improve City Park amenities. <br />B.The City Council recognizes the value and need to provide Everett residents and visitors with open <br />recreation spaces. <br />C.The City recognizes the need to improve neighborhood walkability and encourage non-motorized <br />forms of transportation. <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br />Section 1. A special improvement project fund is hereby entitled “Walter E. Hall Park Community <br />Connections Path”, Fund 354, Program 094. <br />Section 2. Authorization is hereby granted to the Parks and Facilities Department Director under <br />the administration of the Mayor, to assume full responsibility for conducting all tasks and performing all <br />necessary steps to accomplish the actions authorized by this Ordinance. <br />Section 3. The estimated cost for design and construction is $350,000. <br />Section 4. The sum of $350,000 is hereby appropriated to Fund 354, Program 094, “Walter E. Hall <br />Park Community Connections Path” project. <br />A.Use of Funds <br />Design and Construction Costs $350,000 <br />Total $350,000 <br />B.Source of Funds <br />Community Development Block Grant $350,000 <br />Total $350,000
The URL can be used to link to this page
Your browser does not support the video tag.