My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eagle Fence and Iron LLC 3/20/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Eagle Fence and Iron LLC 3/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 8:58:51 AM
Creation date
3/27/2024 8:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Eagle Fence and Iron LLC
Approval Date
3/20/2024
End Date
6/14/2024
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
Everett Station Platform Gate and Fencing
Tracking Number
0004267
Total Compensation
$14,014.71
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> <br />LIMITED (SMALL WORKS) PUBLIC WORKS CONTRACT #2024-051 <br /> <br />THIS LIMITED (SMALL WORKS) PUBLIC WORKS CONTRACT, which is pursuant to RCW 39.04.155(3), <br />is dated and effective as of the date of last signature below and is by and between the City of Everett, a <br />Washington municipal corporation (the “City”), and the Contractor shown below in the Basic <br />Provisions. <br />1. Basic Provisions: <br />Contractor <br />Eagle Fence and Iron LLC <br />13717 30th Avenue NW <br />Marysville, WA 98271 <br />eaglefenceandiron@gmail.com <br />City Project <br />Manager <br />James Sauls <br />City of Everett – Everett Transit <br />3201 Smith Avenue <br />Everett, WA 98201 <br />jsauls@everettwa.gov <br />Contract <br />Documents <br />The Contract contains and incorporates the following (the <br />“Contract Documents”): this contract document, all provisions <br />required by law, change orders, and Contractor’s <br />proposal/quotation to the extent such document is attached <br />hereto, in accordance with Section 2.A below. No Contractor- <br />provided document is part of this Contract unless it is attached. <br />Project <br />The Contractor will furnish all labor, tools, materials, equipment, and <br />supplies required to complete all work as set forth in the Contract <br />Documents. The entire work set forth in the Contract Documents is <br />referred to herein as either the “Work” or the “Project.” <br />A brief (and not necessarily complete) description of the Project is <br />follows: New fencing and gate installation at Everett Station at the <br />northeast and southeast corner of the train platform. <br />Contract Time <br />The Project shall be physically complete in all respects within 90 <br />calendar days from the date of issuance of a Notice to Proceed. <br />The Contractor shall not start the Work until receipt of Notice to <br />Proceed from the City. If a purchase order is issued for the Work, it <br />is only a Notice to Proceed. The purchase order’s pre-printed
The URL can be used to link to this page
Your browser does not support the video tag.