My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9702 19TH AVE SE Geotech Report 2024-03-28
>
Address Records
>
19TH AVE SE
>
9702
>
Geotech Report
>
9702 19TH AVE SE Geotech Report 2024-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:26:52 AM
Creation date
3/27/2024 9:27:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9702
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Ridge — DRH, LLC ES-7829.01 <br /> August 26, 2021 Page 14 <br /> The passive earth pressure and coefficient of friction values include a safety factor of 1.5. The <br /> vault walls should be backfilled with free-draining material or suitable common earth if a sheet <br /> drain material is used. The upper one foot of the wall backfill can consist of a less permeable <br /> soil, if desired. A perforated drain pipe should be placed along the base of the wall and connected <br /> to an approved discharge location. If the elevation of the vault bottom is such that gravity flow to <br /> an outlet is not possible, the portion of the vault below the drain should be designed to include <br /> hydrostatic pressure. Design values accounting for hydrostatic pressure are included above. <br /> ESNW should observe grading operations for the vault and the subgrade conditions prior to <br /> concrete forming and pouring to confirm conditions are as anticipated, and to provide <br /> supplemental recommendations as necessary. Additionally, ESNW should be contacted to <br /> review final vault designs to confirm the geotechnical design parameters recommended above <br /> have been incorporated into the plans. <br /> Vault backfill should be placed and compacted in accordance with the recommendations provided <br /> in the Structural Fill section of this report. <br /> Seismic Design <br /> The 2018 International Building Code (2018 IBC) recognizes the most recent edition of the <br /> Minimum Design Loads for Buildings and Other Structures manual (ASCE 7-16) for seismic <br /> design, specifically with respect to earthquake loads. Based on the soil conditions encountered <br /> at the boring locations, the parameters and values provided below are recommended for seismic <br /> design per the 2018 IBC. <br /> Parameter Value <br /> Site Class C* <br /> Mapped short period spectral response acceleration, Ss (g) 1.354 <br /> Mapped 1-second period spectral response acceleration, S1 (g) 0.479 <br /> Short period site coefficient, Fa 1.200 <br /> Long period site coefficient, Fv 1.500 <br /> Adjusted short period spectral response acceleration, SMs (g) 1 .624 <br /> Adjusted 1-second period spectral response acceleration, SM1 (g) 0.719 <br /> Design short period spectral response acceleration, SDs (g) 1.083 <br /> Design 1-second period spectral response acceleration, SD1 (g) 0.479 <br /> Assumes very dense soil conditions, encountered to a maximum depth of 30.5 feet bgs during the April 2021 field <br /> exploration, remain very dense to at least 100 feet bgs. Based on our experience with the project geologic setting <br /> (glacial till) across the Puget Sound region, soil conditions are likely consistent with this assumption. <br /> Earth Solutions NW, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.