Laserfiche WebLink
Y Earth Solutions NW, LLC TEST PIT NUMBER TP-5 <br /> 15365 N.E.90th Street,Suite 100 PAGE 1 OF 1 <br /> + im <br /> Redmond,Washington 98052 <br /> Telephone: 425-449-4704 <br /> Fax: 425-449-4711 <br /> PROJECT NUMBER ES-7829.01 PROJECT NAME Grayson Square <br /> DATE STARTED 3/17/21 COMPLETED 3/17/21 GROUND ELEVATION <br /> EXCAVATION CONTRACTOR NW Excavating LATITUDE LONGITUDE <br /> EXCAVATION METHOD GROUND WATER LEVEL: <br /> LOGGED BY AZS CHECKED BY HTW SZ AT TIME OF EXCAVATION <br /> NOTES Depth of Topsoil&Sod 2":grass <br /> Lu <br /> }� U <br /> = H Lu U <br /> 2 <br /> w g TESTS 0-O MATERIAL DESCRIPTION <br /> ❑ Uj <br /> 2 Z <br /> Q U <br /> U <br /> 0 <br /> TPSL Dark brown TOPSOIL <br /> Brown silty SAND with gravel,loose to medium dense, moist to wet <br /> MC= 14.5% SM <br /> 2.0 <br /> Gray silty SAND with gravel,dense, moist <br /> iron oxide staining, moderately cemented <br /> MC=7.1% <br /> SM <br /> 5 MC-9.9% 5 o Test pit terminated at 5.0 feet below existing grade. No groundwater encountered during <br /> excavation. No caving observed. <br /> N <br /> N <br /> W <br /> F <br /> 0 <br /> W <br /> F <br /> Q <br /> J <br /> a <br /> LU <br /> LU <br /> U_ <br /> 2 <br /> CL <br /> Q <br /> c� <br /> a <br /> c� <br /> m <br /> N <br /> of <br /> n <br /> J <br /> J <br /> W <br /> a <br /> x <br /> m <br /> J <br /> W <br /> Z <br /> W <br />