My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2022 BLDG 40-31 Plans 2024-03-28
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-31
>
Plans
>
3003 W CASINO RD 2022 BLDG 40-31 Plans 2024-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 1:06:39 PM
Creation date
3/27/2024 10:41:06 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-31
Permit
FA2205-002
Year
2022
Notes
REPLACE SPRINKLER MONITORING PANEL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- *SPRINKLER VALVE WATERFLOW ALARM LEGEND <br /> MONITORING AND WATERFLOW ISOLATION SEE SHEET EOG FOR LEGEND AND ABBREVIATIONS <br /> TO SPRINKLERS WATERFLOW SUPERVISION EQUIPMENT INSTALLATION A <br /> r <br /> PRESSURE SWITCH <br /> WITH BUILT-IN <br /> RETARD/DELAY, I A <br /> POTTER #WFSR-F <br /> (ALARM) I <br /> 1 I <br /> I GENERAL NOTES <br /> 1 ELECTRICAL <br /> POWER CONTRACTOR SHALL INSTALL ENCLOSURE(S) <br /> � � I TO WATER AND <br /> MOTOR GONG 2. SPRINKLER RISER PIPING CONFIGURATION SHOWN IS <br /> WATER PRESSURE GAUGE J <br /> (SYSTEM PRESSURE) 9 — — — DIAGRAMMATIC AND DOES NOT NECESSARILY REPRESENT <br /> ALARM LINE 9 WATERFLOW <br /> ANY SPECIFIC INSTALLATION. <br /> (ISOLATION ISOLATION <br /> (OPEN) VALVE, 8 TAMPER SWITCH, <br /> APOLLOPOTTER # <br /> RBVS <br /> BY-PASS LINE #94A-103-274. (SUPERVISORY)) <br /> [-- — — — <br /> CHECK VALVE c RETARD REFERENCE DRAWINGS <br /> CHAMBER <br /> WATER PRESSURE GAUGE CHECK DRAIN <br /> VALVE <br /> (SUPPLY PRESSURE) OPEN (CLOSED) A <br /> L — _ - - J <br /> OS&Y TAMPER <br /> SWITCH WATER BY-PASS TEST ANALOG PHONE LINE (PRIMARY) CONSTRUCTION NOTES <br /> (SUPERVISORY) VALVE (CLOSED) STRAINER FlRE ALARM <br /> DRIP CONTROL - *TELCO ( 1. ALL WIRING SHALL BE DRESSED AND TRAINED IN A <br /> (III CUP PANEL DEMARC MONITORED BY TYCO AND WORKMANLIKE MANNER. <br /> (FACP) SIGNAL SENT TO CENTRAL <br /> BOEING FIRE DEPARTMENT 2. ALL WIRES SHALL BE LABELED WITH WIRE ID. <br /> FIRE ALARM CABLING ANALOG PHONE LINE (SECONDARY) 3. ALL INCOMING POWER WIRING SHALL BE IN CONDUIT. <br /> OS&Y VALVE _ 4. ALL PENETRATIONS TO FIRE ALARM CONTROL PANEL <br /> CONTROL (OPEN) ISMOKE DETECTOR, *TWO SEPARATE PATHWAYS FOR SIGNAL REQUIRED BY AND TELECOMMUNICATIONS ENCLOSURES SHALL BE IN <br /> CHECK PULL STATION, WATER CODE, AS SHOWN. ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br /> VALVE FLOW & TAMPER <br /> SWITCHES *BOEING SERVICES REQUEST MUST BE MADE PROVIDE PHENOLIC LABELS, INSTALL AND CENTER ON <br /> REQUESTING: TWO ANALOG VOICE (BUSINESS FLAT LINE) UPPER ENCLOSURE DOOR WITH FACP AND POWER <br /> ®�HORNS, BELLS JACK/CONNECTIONS. AFTER JACKS ARE INSTALLED, CIRCUIT IDENTIFICATIONS. LABELS SHALL HAVE WHITE <br /> DRAIN & STROBES ANALOG LINES MUST BE REQUESTED TO CONNECT LETTERING AND RED BACKGROUND. <br /> WATER SUPPLY PIPE ANALOG VOICE JACKS. <br /> © CONFIGURE FIRE ALARM CONTROL PANEL TO TRANSMIT <br /> *NOTE: PRIMARY AND SECONDARY COMMUNICATIONS IN A <br /> LIMIT OF ONE (1) ISOLATION SIMULTANEOUS MANNER IN ACCORDANCE WITH <br /> VALVE ON ALARM SENSING LINE. NFPA72-2016 26.6.4.1.4(6)(7). <br /> SPRINKLER RISER WATERFLOW PRESSURE SWITCH W/DELAY DETAIL FIRE ALARM SYSTEM SIGNAL AND COMMUNICATIONS OVERVIEW [Z:� PROVIDE CONDUIT WITH PULLSTRING. <br /> SCALE: NONE E506-1 SCALE: NONE <br /> E506-1 ® PROVIDE LINE SIZE BALL VALVE WITH LOCKABLE <br /> HANDLE, TYPE AS NOTED, ON ALARM LINE UPSTREAM <br /> OF ALARM SWITCH. FIELD VERIFY CORRECT SIZE. <br /> PROVIDE TAMPER SWITCH, TYPE AS NOTED, ON <br /> ISOLATION VALVE AS SHOWN. <br /> ® PROVIDE WATERFLOW PRESSURE SWITCH WITH <br /> A A ADJUSTABLE DELAY, TYPE AS NOTED. <br /> 11. CONFIRM ONLY ONE (1) ISOLATION VALVE IS INSTALLED <br /> 6 6 ON WATERFLOW SENSING LINE. WHERE EXISTING <br /> INSTALLATIONS HAVE MORE THAN ONE (1) VALVE, <br /> 5 5 COORDINATE REMOVAL OF ADDITIONAL VALVE(S) WITH <br /> BOEING CONSTRUCTION MANAGER. <br /> 12"X12" PHONE J-BOX 12"X12" PHONE J-BOX 12. COORDINATE WITH FIRE SPRINKLER CONTRACTOR FOR <br /> FACP EVT-FA-40-31 FOR PRIMARY ANDFACP EVT-FA-40-30/31 FOR PRIMARY AND INSTALLATION OF DEVICES AND PIPING MODIFICATIONS. <br /> PRIMARY CONNECTION:< 7 PRIMARY CONNECTION: 7 <br /> (EXISTING ELEVATOR 1 FACP ® C.5/13) SECONDARY PHONE PHONE LINE TO TELEPHONE (EXISTING ELEVATOR 4 FACP ® A.5/13.3) SECONDARY PHONE PHONE LINE TO TELEPHONE <br /> LINE JACKS BACKBOARD/ DEMARC. UNE JACKS BACKBOARD/ DEMARC. <br /> (BY ELECTRICAL (CABLING BY BOEING IT) (BY ELECTRICAL <br /> CONTRACTOR) CONTRACTOR) (CABLING BY BOEING IT) <br /> SECONDARY CONNECTION-Q SECONDARY CONNECTION:Q <br /> PHONE LINE TO TELEPHONE PHONE LINE TO TELEPHONE <br /> BACKBOARD/DEMARC. BACKBOARD/DEMARC. <br /> (CABLING BY BOEING IT) (CABLING BY BOEING IT) <br /> FIRE ALARM SYSTEM COMMUNICATIONS DETAIL FIRE ALARM SYSTEM COMMUNICATIONS DETAIL <br /> SCALE: NONE E506-1 SCALE: NONE E506-1 <br /> G OW <br /> SYIA REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE <br /> ACCEPTABILITY DRAWN DATE SUaDn.E FIRE ALARM SYSTEM DETAILS CURRENT REVISION SYMBOL B DATE 04.07.22 <br /> A EVERETT FIRE PANEL REPLACEMENT W2640474 SAZAN/ZO 12.28.21 THIS DESIGN AND/OR CHECKED <br /> SPECIFICATION IS APPROVED <br /> B SHOP DRAWINGS AGOW/HG 04.07.22BOE,NG m APPROVED BY DEPT. DATE TITLE SHEET SEQUENCE NO. <br /> EVERETT FIRE PANEL REPLACEMENT E506-1 <br /> PETE Li"..N APPROVED BUILDING 40-031 <br /> Gam..- ,,a„ APPROVED ELECTRICAL MASTER EVERETT, WA. DwD NO. 40-031-E506-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.