My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/03/27 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/03/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 6:32:29 PM
Creation date
3/27/2024 6:29:10 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 2 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br /> <br />It is anticipated that the operator comfort building will provide two restrooms and a breakroom <br />(approximately 400 SF in size). The building must be durable and readily available to be delivered <br />to the project site. It’s important to be aware that modular buildings have a long lead time. <br />Typically, they can be produced, delivered, and installed within 10 to 12 months from the time the <br />order is placed. Procurement of the modular building is a critical path element for this project. <br />SCOPE OF SERVICES <br />To commence with the development of the Project, and to guide the Project to its completion <br />based on our current understanding, PACE proposes to provide the following services: <br />1. Project Management <br />PACE will lead and manage the overall design phase of the project. <br /> Prepare work plan <br /> Hold project kickoff meeting <br /> <br /> <br />Independent arrival Sawtooth Modified arrival
The URL can be used to link to this page
Your browser does not support the video tag.