My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/03/27 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/03/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 6:32:29 PM
Creation date
3/27/2024 6:29:10 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 7 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br /> All field explorations conducted through the pavement will be patched with <br />aquaphalt. Saw cutting of the pavement or hot mix asphalt patches will not be <br />completed. <br /> One round of review of the Geotechnical and Pavement Engineering Report will be <br />required. <br /> Following delivery of the draft report, all soil samples will be disposed of, unless <br />otherwise mutually agreed upon. Long-term storage of soil samples by HWA is not <br />included. <br />DELIVERABLES <br /> Geotechnical Subsurface Exploration Plan (PDF) <br /> Draft Preliminary Geotechnical Engineering Report (PDF) <br /> Preliminary Geotechnical Engineering Report (PDF) <br />Client Responsibilities <br /> Provide access to the site to perform site reconnaissance, utility locates, and <br />pavement coring. <br /> Provide necessary permits and rights of entry at no cost to HWA <br />4. Conceptual Design <br />The extent of the conceptual design task to develop two to four transit center schematic <br />site options, gain City and mall developer input and create one preferred site plan. <br /> Prepare two to four site options. <br /> Prepare one preferred site plan. <br />Site layout options will be sketched on aerial based GIS files. Formal CAD files will not be <br />prepared until the 60% design phase. <br />5. Mall Coordination <br />Hold up to four (4) virtual meetings with the Mall Developer to gain transit center <br />relocation and design consensus. <br />6. Restroom Building Coordination <br />Hold up to four (4) virtual meetings to review design needs and procurement of the project <br />restroom building. Public Restroom Company seems to provide a modular design that <br />addresses Everett Transit needs.
The URL can be used to link to this page
Your browser does not support the video tag.