My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/03/27 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/03/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 6:32:29 PM
Creation date
3/27/2024 6:29:10 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 12 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br />x 17"). This scale allows the most efficient breakdown of the site while providing <br />sufficient detail to convey the design intent. The anticipated plans are as <br />follows: <br /> Cover (1 plan sheet) <br /> Legend and Abbreviations (1 plan sheet) <br /> Site Plan (1 plan sheet) <br /> Horizontal Control Plan (1 plan sheet) <br /> Survey Control Plan (1 plan sheet) <br /> Site Preparation and Erosion Control (1 plan sheet) <br /> Site Preparation and Erosion Control Details (1 sheet) <br /> Grading Plan (2 plan sheets) <br /> Grading Details and Sections (1 plan sheet) <br /> Drainage Plan (2 plan sheets) <br /> Drainage Details and Facility Plans (1 sheet) <br /> Utility Plan (1 plan sheet) <br /> Paving, Signage and Channelization Plan (2 plan sheets) <br /> Paving, Signage and Channelization Details (1 plan sheet) <br /> Restroom Building Utility Connection (1 plan sheet) <br /> Illumination Plans (2 plan sheets) <br />In addition, plans by other disciplines will be provided at ITB as described herein. <br />Assumptions: <br /> Major design changes as a result of City permit review are excluded from the Scope <br />of Services. <br /> Comments on 60% plans will be provided to the Consultant in a consolidated, non- <br />conflicting format. Either plan markups or tabulated comments are acceptable. <br /> The project configuration selected in 60% plan development phase will not be <br />substantially revised during the course of the design efforts. <br /> Design will be in accordance with City of Everett Development Standards. <br /> The project configuration selected in conceptual plan development phase will not <br />be substantially revised during the course of the design efforts. <br /> Design will be in accordance with City of Everett Development Standards. <br /> No additional water and sewer work will be required except for service lines as <br />described herein. No utility main extensions will be provided. <br /> Specifications will be in WSDOT/APWA format. <br /> Everett Transit will provide boilerplate contract language to be included with the <br />specifications.
The URL can be used to link to this page
Your browser does not support the video tag.