My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/03/27 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/03/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 6:32:29 PM
Creation date
3/27/2024 6:29:10 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 16 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br />GENERAL ASSUMPTIONS <br />• City will secure all rights of entry <br />• 30% Civil Plans or Estimates will not be prepared <br />• Wetland delineations and buffer reviews are excluded from this Scope of Services <br />• Traffic analysis is excluded and will not be prepared <br />• Cultural resource investigation is excluded and will not be prepared <br />• All other permits and regulatory approvals not specifically identified in this Scope will be <br />secured by others. <br />• Property encumbrance exhibit will be prepared by others (Mall Surveyor) <br />• If required, stormwater detention vault sizing and control structure will be specified. <br />Structural vault design will be a deferred submittal that low bid contractor will be <br />required to prepare. <br />• Existing transit center will be demolished/removed by others. <br />• Civil design and design support is limited to the area at Everett Mall, depicted by the <br />graphics presented under the project understanding. Off-site improvements outside of <br />that view are excluded. <br />• Construction management and inspection services are excluded at this time and have <br />not been budgeted for. <br />• Standard Everett Transit shelters will be incorporated into the project. Shelter design is <br />excluded from this project. <br />• City to provide title reports to the consultant. <br />• Utilities are readily available, located within 100 LF of the site. <br />PROJECT SCHEDULE <br />The project will be fully designed in four months from notice to proceed, with the assumption that <br />timely revisions and decisions will be made by the City. Everett Transit is responsible for <br />coordinating other City Department reviews of plans and permit applications. <br />OWNER PROVIDED MATERIAL <br />• Site Right-of-Entry <br />• Standard Bus Shelter Plans & Specifications <br />• Transit Bay Flag Plan & Specifications
The URL can be used to link to this page
Your browser does not support the video tag.