Laserfiche WebLink
The comments below were generated from this project's Stormwater Reviewers. All questions shall be routed through this project's Public Works Reviewer <br />Thad Newport with City of Everett Permit Services (TNewportpeverettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />Confirm with letter from third party maintenance <br />provider that vactor truck will be able to maintain <br />detention facility and catch basins within garage area. <br />The comments below were generated from this project's City of Everett Planning Reviewers. All questions shall be routed through this project's Public Works <br />Reviewer Thad Newport with City of Everett Permit Services (TNewportpeverettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />2 <br />Civil Plans <br />Plan sets still reference EMC 19.20. Remove all <br />reference to this chapter as it was repealed effective <br />11.24.2020. <br />3 <br />Landscape <br />Landscape frontage is required to be Type III for 10 <br />Plans <br />feet in width per EMC 19.35.060 Tables 35-1 and 35- <br />2. The designer's response of "5' Frontage <br />landscaping has been provided along with hardscape <br />to provide visual separation of uses from streets" is <br />not adequate to comply with code. The revised <br />landscape plans do not comply with frontage <br />landscape requirements. If the applicant does not <br />wish to provide 10' of required frontage landscaping, <br />approval of a land use permit for landscape <br />modification is required prior to Public Work permit <br />approval. <br />Page 2 of 2 <br />