My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 112TH ST SE CHEVRON 2024-05-06
>
Address Records
>
112TH ST SE
>
1515
>
CHEVRON
>
1515 112TH ST SE CHEVRON 2024-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2024 7:18:49 AM
Creation date
3/29/2024 10:49:42 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
1515
Tenant Name
CHEVRON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# S 1-- 30 I " 0 0 , <br /> •BUILDING •LANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone ri <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use ( g S -f/�jY] <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size _ Total No. of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of __Stories "In Lieu" Fee: Type: Amount$ <br /> Basement ❑No ❑Yes , Fin/Unfin _ School Impact Fee: Total $ Off <br /> Type of Construction _ Calculated: Credit: <br /> Occupancy Group DEverett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for per its applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not Req'd Park Impact Fee Total (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: I: 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total $/1 ()CV,vd Additional Notes: <br /> Approved By: Date: <br /> • PUBLIC WORKS <br /> Additional Notes: Intake OK by:—�— Date: 01 103_24EIL� <br /> Intake Comments: PW Worksheet Neede <br /> d if: <br /> ❑Sys Dev Eval (Util/SW)❑Traffic Mit Eval <br /> Approved B t4774 Date:Pz�y rwr.3 ❑Site Work/Drainage DAddress Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> ------------------------------------- <br /> Separate/Deferred Submittals Required: DRoute this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ODeferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept. Fees: 0 See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑ A Separate PW Permit is Required(Permit#:PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND 0 Is located in this folder <br /> ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> El Review/Inspection Scope-ADD FIRE FEE <br /> Approved By: Date: ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> W"+ Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: ©`'it•y023 <br /> Approved By: Date: Completed Date: <br /> liJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.