My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9502 18TH AVE W UNIT H 2025-06-24
>
Address Records
>
18TH AVE W
>
9502
>
UNIT H
>
9502 18TH AVE W UNIT H 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 9:43:00 AM
Creation date
4/1/2024 1:06:00 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9502
Tenant Name
UNIT H
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113TIL 19011 Wood-Sno Road NE,Suite 100 <br /> Woodinville,WA 98072-4436 <br /> Phone:(425)814-8448 <br /> ENGINEERING Fax:(425)821-2120 <br /> SPECIAL INSPECTION <br /> Date: April 11,2024 <br /> To: Pacific Ridge Homes <br /> Attn: Sam Wiper <br /> From: Aiden Bernhardt <br /> Project: Harrison Point—Lot 8 Pages: 1 <br /> Thelon B- Garage Right <br /> BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br /> nailing at 4"on center or less for the above-mentioned project. The following Special Inspection Report includes a <br /> summary of our site visit. <br /> Construction Documents: <br /> ❑ Construction Set dated 05/12/2023 <br /> Progress of construction: <br /> ❑ Date of inspection:4/09/2024 <br /> ❑ Foundation completed <br /> ❑ Framing completed <br /> Items observed: <br /> 1 st Floor Walls: <br /> ❑ Rear/Sides/Interior:P1--6—No Inspection Required <br /> ❑ Front P1-2 Shear Walls <br /> o Edge Nailing and Sheathing Splices: Three instances ofinsufficient nail spacing were <br /> observed at time ofinspection. Contractor was notified and provided photos <br /> demonstrating a resolution. Construction conforms to plan set. <br /> o Panel Seams Construction: Construction conforms to plan set. <br /> o Foundation Anchorage: Construction conforms to plan set. <br /> o Garage Pier Construction: Construction conforms to plan set. <br /> 2nd Floor Walls: <br /> ❑ All Sides:P1-6-No Inspection required <br /> Give me a call if you have any questions or comments. <br /> Sincerely, <br /> Aiden Bernhardt P.E. <br /> BTL Engineering T.L9 <br /> �g5666 <br /> ST90 <br /> stoxat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.