My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/04/03 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/04/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 3:13:44 PM
Creation date
4/4/2024 11:28:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: An Ordinance closing a special improvement project entitled “Everett Mall Way – 4th Ave to East <br />Mall Drive Intersection Safety” Fund 303, Program 106, as established by Ordinance No. 3835-21. <br />Council Bill # <br />CB 2403-89 <br />Consideration: Closing Ordinance <br />Project: Everett Mall Way – 4th Ave to East Mall Drive Intersection Safety <br />Partner/Supplier: Washington State Department of Transportation <br /> Location: Everett Mall Way <br />Preceding action: Rejection of Bid 5/2/2018 <br />Fund: 303 – Public Works Improvements <br />Agenda dates requested: <br /> <br />Briefing <br />1st Reading 03/27/24 <br />2nd Reading 04/03/24 <br />Consent <br />Action 04/10/24 <br />Ordinance X <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed Ordinance <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />(425) 257-8809 <br /> <br />Email: <br />thood@everettwa.gov <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br /> <br />Fiscal summary statement: <br />This project incurred costs of $130,014 and a balance transfer to Fund 119 – Street <br />Improvements Fund in the amount of $453,220 for total costs of $583,234. <br /> <br /> <br />Project summary statement: <br />The Public Works department applied for a 2014 federal grant to design and construct <br />traffic improvements on Everett Mall Way from 4th Ave to East Mall Drive. New <br />electrical and fiber optic conduits were installed, along with upgrades to associated ADA <br />ramps. <br />Bids opened in Spring of 2018, with low interest from the contracting community. The <br />City received one bid, which was 45% ($780,000) above Engineer’s Estimate. A <br />competitive bid result was not achieved, and the Washington State Department of <br />Transportation (WSDOT) concurred with the City’s recommendation to reject the sole <br />bid. Subsequent to council’s rejection of the sole bid, the department conducted an in- <br />depth Value Engineering (VE) analysis, and an exhaustive review of the project scope. In <br />consultation with WSDOT, it was concluded that the project scope could not be <br />narrowed sufficiently to meet the available funding and the intent of the grant award, <br />while maintaining constructability. The City plans to rescope and pursue external <br />funding in the near future. <br /> <br />Recommendation (exact action requested of Council): <br />An Ordinance closing a Special Improvement Project entitled “Everett Mall Way – 4th <br />Ave to East Mall Drive Intersection Safety” Fund 303, Program 106, as established by <br />Ordinance No. 3835-21. <br />
The URL can be used to link to this page
Your browser does not support the video tag.