Laserfiche WebLink
<br />Forest Park Pickleball Sport Court Improvements Page 6 of 7 <br /> <br />8. Structural detail for lighting standards only. Non-structural wall plan, elevation, <br />and details. <br />9. Stormwater plan. <br />10. Utility plan. <br />11. Electrical plan and Telecom relocation plan. <br />12. Lighting plan. <br />7.2 Documents and Reports: Develop final documents to support Construction Documents <br />and provide information for permit review, including: <br />1. SWPPP <br />2. Stormwater Technical Information Report <br />3. Lighting Calculations <br />7.3 Cost Opinion: Develop final draft cost estimate with any additive alternates required to <br />meet City budget. <br />7.4 Specifications: Provide full technical specifications in CSI Master Format Specification <br />format. Provide comment on City-provided Division 0 and Division 1 Specifications. <br />Assumptions: <br />• One round of permit review comments anticipated. <br />Deliverables: <br />• 90% Construction Document plan set, pdf <br />• 90% Construction Document cost opinion, pdf <br />• 90% Specifications and any Appendices, pdf <br />• Comments on City-provided Division 0 and Division 1 Specifications, pdf <br />Meetings: <br />• None. Meetings, including project review meeting of City comments, assumed to be <br />incorporated into Task 1.2. <br /> <br />TASK 8. 100% BID DOCUMENTS <br />8.1 Finalize Plan Set: Incorporate comments as provided by City, and any final permit <br />review comments, and finalize plan set. Prepare 100% drawings. Plan set to include final <br />version of the sheets identified in Task 7 above. <br />8.2 Finalize Documents and Reports: Incorporate comments as provided by City, and any <br />final permit review comments, and finalize documents and reports as identified in Task 7 <br />above. <br />8.3 Cost Opinion: Develop final cost estimate with any additive alternates required to meet <br />City budget. <br />8.4 Specifications: Finalize full technical specifications in CSI Master Format Specification <br />format. Provide electronic copy to City for final assembly into comprehensive bid <br />package. <br />Assumptions: <br />• One round of permit review comments anticipated. <br />Deliverables: <br />• 100% Construction Document plan set, pdf <br />• 100% Construction Document cost opinion, pdf <br />• 100% Specifications and any Appendices, pdf <br />Meetings: