Laserfiche WebLink
AIA Document A133™– 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. <br />The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used <br />without permission. This draft was produced by AIA software at 14:22:51 ET on 09/16/2022 under Order No.2114304515 which expires on <br />03/23/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents ® Terms <br />of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes:(1131696201) <br /> <br />4 <br />nature incurred by Owner which are caused by any delay in achieving Substantial Completion or Final Completion, <br />provided this limitation shall not apply to Construction Manager’s duty to indemnify the Owner or to warrant <br />Construction Manager’s Work as provided in this Contract and shall not apply to any loss, damage, cost or liability <br />incurred by Owner due to factors unrelated to Construction Manager’s delay. <br />ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />§ A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract <br />Documents and the following: <br />§ A.3.1.1 The following Supplementary and other Conditions of the Contract: <br />Document Title Date Pages <br />N/A <br />§ A.3.1.2 The following Specifications: <br />(Either list the Specifications here, or refer to an exhibit attached to this Amendment.) <br />Attachment No. 2. The Specifications are as stated in Attachment No. 2 as issued by the Architect on the dates <br />indicated in Attachment No. 2. For each Specification, the Specification includes the changes to that Specification <br />listed in Attachment No. 2. Division 00 and 01 are as in the Request for Final Proposals, which is attached as Exhibit 1 <br />to the Agreement. <br />Section Title Date Pages <br />N/A <br />§ A.3.1.3 The following Drawings: <br />(Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br />Attachment No. 2. The Drawings are as stated in Attachment No. 2 as issued by the Architect on the dates indicated in <br />Attachment No. 2. For each Drawing, the Drawing includes the changes to that Drawing listed in Attachment No. 2. <br />Number Title Date <br />N/A <br />§ A.3.1.4 The Sustainability Plan, if any: <br />(If the Owner identified a Sustainable Objective in the Owner’s Criteria, identify the document or documents that <br />comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The <br />Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; <br />implementation strategies selected to achieve the Sustainable Measures; the Owner’s and Construction Manager’s <br />roles and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, <br />testing or metrics to verify achievement of each Sustainable Measure; and the Sustainability Documentation required <br />for the Project, as those terms are defined in Exhibit C to the Agreement.) <br />Title Date Pages <br />N/A <br />Other identifying information: <br />§ A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: <br />(Identify each allowance.) <br />Item Price <br />Attachment No. 3 $1,000,000 <br />§ A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: <br />(Identify each assumption and clarification.) <br />N/A