My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington Department of Ecology 4/5/2024
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington Department of Ecology 4/5/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 10:56:42 AM
Creation date
4/5/2024 10:55:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington Department of Ecology
Approval Date
4/5/2024
Council Approval Date
3/13/2024
End Date
1/30/2026
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
PGSF Ecology Water Quality Grant Agreement
Tracking Number
0004289
Total Compensation
$3,765,954.75
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 29 of 41State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />WQC-2024-EverPW-00027 <br />City of Everett Port Gardner Water Quality Program – Phase 1 Design <br />City of Everett <br />redemption of, Senior Lien Obligations and to redeem promptly the loan, and (2) to provide for part of the cost of additions to <br />and betterments and extensions of the Utility. <br />R. Sewer-Use Ordinance or Resolution for Funded Wastewater Facility Projects : If not already in existence, the RECIPIENT <br />shall adopt and shall enforce a sewer-use ordinance or resolution. Such ordinance or resolution shall be submitted to <br />ECOLOGY upon request. <br />The sewer use ordinance must include provisions to: <br />1) Prohibit the introduction of toxic or hazardous wastes into the RECIPIENT’s sewer system . <br />2) Prohibit inflow of stormwater into separated sewer systems. <br />3) Require that new sewers and connections be properly designed and constructed. <br />S. Termination and Default: <br />Termination and Default Events <br />1. For Insufficient ECOLOGY or RECIPIENT Funds. ECOLOGY may terminate this loan agreement for insufficient <br />ECOLOGY or RECIPIENT funds. <br />2. For Failure to Commence Work. ECOLOGY may terminate this loan agreement for failure of the RECIPIENT to <br />commence project work. <br />3. Past Due Payments. The RECIPIENT shall be in default of its obligations under this loan agreement when any loan <br />repayment becomes 60 days past due. <br />4. Other Cause. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance in full by the <br />RECIPIENT of all its obligations under this loan agreement. The RECIPIENT shall be in default of its obligations under this <br />loan agreement if, in the opinion of ECOLOGY, the RECIPIENT has unjustifiably failed to perform any obligation required of <br />it by this loan agreement. <br />Procedures for Termination. If this loan agreement is terminated prior to project completion, ECOLOGY shall provide to the <br />RECIPIENT a written notice of termination at least five working days prior to the effective date of termination (the <br />“Termination Date”). The written notice of termination by the ECOLOGY shall specify the Termination Date and , when <br />applicable, the date by which the RECIPIENT must repay any outstanding balance of the loan and all accrued interest (the <br />“Termination Payment Date”). <br />Termination and Default Remedies <br />No Further Payments. On and after the Termination Date, or in the event of a default event, ECOLOGY may, at its sole <br />discretion, withdraw the loan and make no further payments under this agreement. <br />Repayment Demand. In response to an ECOLOGY initiated termination event , or in response to a loan default event, <br />ECOLOGY may at its sole discretion demand that the RECIPIENT repay the outstanding balance of the Loan Amount and all <br />accrued interest. <br />Interest after Repayment Demand. From the time that ECOLOGY demands repayment of funds, amounts owed by the <br />RECIPIENT to ECOLOGY shall accrue additional interest at the rate of one percent per month , or fraction thereof. <br />Accelerate Repayments. In the event of a default, ECOLOGY may, in its sole discretion, declare the principal of and interest <br />on the loan immediately due and payable, subject to the prior lien and charge of any outstanding Senior Lien Obligation upon <br />the Net Revenue. That is, the loan is not subject to acceleration so long as any Senior Lien Obligations are outstanding. <br />Repayments not made immediately upon such acceleration will incur Late Charges . <br />Late Charges. All amounts due to ECOLOGY and not paid by the RECIPIENT by the Termination Payment Date or after <br />acceleration following a default event, as applicable, shall incur late charges. <br />Intercept State Funds. In the event of a default event and in accordance with Chapter 90.50A.060 RCW, “Defaults,” any <br />state funds otherwise due to the RECIPIENT may, at ECOLOGY’s sole discretion, be withheld and applied to the repayment <br />of the loan. <br />Property to ECOLOGY. In the event of a default event and at the option of ECOLOGY, any personal property (equipment) <br />acquired under this agreement may, in ECOLOGY’s sole discretion, become ECOLOGY’s property. In that circumstance, <br />Template Version 12/10/2020 <br />DocuSign Envelope ID: 2DF274CE-6C6B-457B-9CB5-5C001EEC8A15
The URL can be used to link to this page
Your browser does not support the video tag.