|
24 VOLT CONNECTION WIRING-BEACON II LSG Sky Chefs-Everett,WA Holding Cooler
<br /> (CONDENSING UNn WITH ONE EVAPORATOR) Refrigeration Schedule Dimensions&Weights
<br /> EVAPOPATOP H"oor"'a"n rJ 4 3 2 ].
<br /> M C A
<br /> CONDENSING UNIT TB It..# Welk4n ID Qty Model'Conti Unit-Evep coil(.) Condensing Unit Dim.W x D x H CIU Wt Evaporator Coil Dim.W x D x H Coil Wt
<br /> TB
<br /> RED105 A,B Holding Cooler+35 F. 2 BCH0055MCDACZ-(1)BEL03BOBSGAEA 43.875"x 30.5"x 29.25" 332 109.5"x 15.375"x 16.5" 137
<br /> samcE
<br /> o BLU ( )is number of evaporator coils for a particular system
<br /> Air flow moves through the width ofthe condensing and
<br /> 01/26/2022 812 SW WASHINGTON ST,SUITE 800
<br /> coaP GRN WRS - by Bill Rapp PORTLAND OREGON 97205
<br /> PHONE 503/226.0622
<br /> 140 Fairoaks Drive,Oakland,TN 38060-901-351-4657 FAX 5 0 3/2 2 6.0 6 2 6
<br /> cont A o 0 0 o WWW.MCA-ARCHITECTS.COM
<br /> y
<br /> ® ® eXT—
<br /> LD WIRING) tur
<br /> R� LSG Sky Chefs -Everett,WA Holding Cooler (E)OFFICE
<br /> 101 (E)OFFICE
<br /> YEL Refrigeration Schedule Piping Refrigerant type R-449A IIFF11 „2
<br /> Heatcrnft-Bohn Line sizes OD"ACRCopper system system Equi,Suct Equi,Liq Dmin Line Receiver 11450 FT Ly-T, 0 2936 REGISTERED
<br /> WH Item# Welk4n I pry M.d.1-C.md Unit-Evep..ills) S—,sl Suct#2 Liq#1 Mq#2 BWh Tons Line Lmh Line Lgth Connection Cepacity90% mdividuIAccessoty IWm Requiratl 10 114$DFr ARCHITECT
<br /> 102
<br /> OLTDWR
<br /> 105A Holding Cooler+35 F_ 1 BCH0055MCDACZ-(1)BELO3BOBS6AEA 1-3/8" x 5/8" x 44,134 368 180' 160' 3/4"FPT 40 C/U EC moors,Evap EC notors 114
<br /> Ta^P 245 SO FT 245 SO FT
<br /> BLU 105 B Holding Cooler+35 F. 1 BCH0055MCDACZ-(1)BEL03BOBS6AEA 1-3/8" x 5/8" x 44,134 3.68 190' 170' 3/4"FPT 40 CIU EC motors,Evap EC Rotors JACK C. MRLER
<br /> ( )is number of evaporator coils for a particular system (E)RES (E REST SPATE OF WASHINGTON
<br /> Suction and liquid#7 is condensing t to first evaporator coil,or a tee if multipleacoils Facto Called on condensing d'drier,sight lass,suction Eger,service valves,overw¢ed receiver,hail ds and 5-year facto t ROOM �QDM
<br /> qui g uni poraFactory ins g un g g guar y factory Warranty Ill 031
<br /> Equivalent line length includes long radius copper fleings and factory p-trap(s) Suction the insulation(evap.outiett condensing unit)to be I"minimum Armaflex or equal
<br /> 0726/2022 B
<br /> 4.-0.
<br /> WRS -by Bill Rapp OO 105B 1 2
<br /> 1 EVAPORATOR WIRING DIAGRAM 140 Fairoaks Drive,Oakland,TN 38060-901-351-4657 110
<br /> R-101 NTS O ASSEMBLY 32 SO FT
<br /> 106
<br /> 0 6
<br /> 3,436 80 FT NEW 4
<br /> IT ROOM 105
<br /> LSG Sky Chefs -Everett,WA Holding Cooler ® � 4
<br /> Refrigeration Schedule Electrical 4880 Fr
<br /> Hea—It,5ahn at-
<br /> -
<br /> lect Elect
<br /> Item# W-4n ID City Model'Conti Unit-Evep wil(s) CN Volt MCA MOPD Accessories Evap Volt FLA A,.G—.es
<br /> 105 A,B Holding Cooler+35 F. 2 BCH0055MCDACZ-(1)BELO38OBS6AEA 208/3/60 27.5 45.0 EC motors 208/1160 3.0 EC motors
<br /> ( )is numberofevapomtorcoils bra pariicularsystem 3 5
<br /> Factory installed components on evaporator coils are temperature controls,electric expansion valve,and Beacon controls C
<br /> Control wiring to be 24 volt,5 conductor cable from condensing unitto master evaporator toll
<br /> 071262022 NEW STORAGE
<br /> COOLER
<br /> WRS -by Bill Rapp 105 107
<br /> —00
<br /> 140 Fairoaks Drive,Oakland,TN 38060-901-351-4657 T 378 SO FT
<br /> LL
<br /> 10 B S�TYPICAL EVAPORATOR/CONDENSING UNIT 24 VOLT WIRING 170%7 5 3 3 5
<br /> 208-230V/60hz/3 PH CONDENSING UNITS AIR DEFROST EVAPORATOR WIRING D
<br /> USE COPPER CONDUCTORS ONLY Q
<br /> Room sensor located on MeMY
<br /> FACTORY WIRING ire clip of the top panel III IANP o o uRM BpP" y
<br /> — — FIELD WIRING DAA No.
<br /> S 4 3 2 1
<br /> PJOMTEMP.SENSOR
<br /> ?No LYEL RDDM TEP.X
<br /> 2 RN MOLME
<br /> DERRDSr TEMP. BEACON II BOARD
<br /> GRN 2PTEMP.
<br /> PN
<br /> SUCaON TEMP.SENSOR IN SU
<br /> N TEMRN P. 24 KEYNOTES 0
<br /> _ &U
<br /> V
<br /> sucnoN UNE sucgory PREBSURE 1 NEW CONDENSING UNIT PLACED ON GROUND SETTING ON NEW CONCRETE �A
<br /> SPINMOEX C PAD.UNITWEIGHT IS 332 LBS N
<br /> MOAOOR MILn IN MIMIXm SER DOW C +2W �� REFRIGERATION PLAN 2 CONDENSING UNIT:DRIER,SIGHT GLASS,SUCTION FILTER,SERVICE VALVES %�
<br /> mmoaancea �t9 (S) ARE TO BE FACTORY INSTALLED /��
<br /> S—ou ONE 3 314"ARMAFLEX SUCTION LINE INSULATION FOR FULL RUN BETWEEN 4) y
<br /> PRESSURETNASDUCEIR R-101 SCALE 1/8"-V-0" FFH...
<br /> calI I I I I CONDENSING UNIT AND EVAPORATORS c
<br /> BLU 1 I GRN RED i YEL 1.
<br /> RH MAT � I Loan 4 WALL PENETRATION FOR REFRIGERATION LINES AND ELECTRICAL CONDUIT cJ
<br /> TOBESEALED Q a
<br /> t- % iMNBFGRvEP W
<br /> NORMAL �Ic " rt 5 SUPPORT CONDUITS AND REFRIGERATION PIPES @ 48'0/C WITH UNISTRUT Y
<br /> sEmlcE RED i P-1000 ` U d 3
<br /> "SERVICE ________ __ \\ %
<br /> oD,,y uNE 6 INSTALL NEW CONDENSATE DRAIN LINES BETWEEN NEW EVAPORATORS TO �/ ^ O- F•
<br /> NEW WALL MOUNTED FUNNEL DRAIN;MAINTAIN V AIR GAP an
<br /> Cont „ p
<br /> --------- V o
<br /> WH _jU
<br /> -U
<br /> wmmmsw •�� RED cm""a jRED 18 GA(FIEM WRING)
<br /> ED
<br /> "� vs OUTDOOR
<br /> j'
<br /> TEMP__
<br /> OUTO(lOR MFIELDWRING
<br /> TEMP
<br /> SENSOR �peR &U j
<br /> i
<br /> T2
<br /> T3® MAELDWIRING
<br /> MTR MTfl MTR MTR MTR
<br /> MOmfl WIflING SHOWN B FACTORYWIRING SLOPE V TO 19
<br /> ttRCa1,t T05 FPNS FlELD WIPING - EVAP EVAp
<br /> (2� EVAPORATOR WIRING DIAGRAM COIL COIL
<br /> TYPICAL EVAPORATOR COIL
<br /> R-101 NTS EACH COIL TO BE TRAPPED ONCE BEFORE ENTERING AN
<br /> O O O UN-TRAPPED MAIN.TRAP FREEZER COIL OUTSIDE FREEZER
<br /> P-TRAPS COMPARTMENT AND TRACE LINE WITH HEAT TAPE.
<br /> BEACON BOARD FANS
<br /> FACTORY P-TRAPS z
<br /> TYPICAL CONDENSING UNIT WALL FUNNEL DRAIN WITH A MINIMUM OF 6"AIR GAP
<br /> r
<br /> ce
<br /> y
<br /> LONG RADIUS ELLS
<br /> GROUND
<br /> a
<br /> 4 REFRIGERANT PIPING 2 EVAPORATOR COILS PER SYSTEM DETAIL 5 EVAPORATOR CONDENSATE
<br /> R-101 NTS R-101 NTS ilit
<br /> w
<br /> Ix
<br /> 3�8”BOLT WITH 1-1/4"UNIT STRUT RUN PERPENDICULAR
<br /> CHECK-OUT&START-UP 1 OD FLAT WASHERS TO COOLER ROOF STRUCTURAL PANEL
<br /> AFTER THE INSTALLATION HAS BEEN COMPLETED,THE FOLLOWING POINTS SHOULD BE COVERED BEFORE THE SYSTEM IS PLACED IN OPERATION: MEMBERS.
<br /> (A) CHECK ALL ELECTRICALAND REFRIGERANT CONNECTIONS.BE SURE THEY ARE ALL CORRECT AND TIGHT. START-UP CHECKLIST SETTINGS A--�
<br /> (B) CHECKVOLTAGE TAPS ON TRANSFORMER.THE TRANSFORMER IS SHIPPED WIRED TO 240 VOLTAGE TAP/CONNECTION.IF YOUR SUPPLY •CHECK BEACON II BOARD SETTINGS FOR THE IJ
<br /> VOLTAGE IS 208 VOLT SYSTEMS,CHANGE TO 208 VOLTAGE TAP. ELECTRICAL FOLLOWING W
<br /> •CHECK PRIMARY SUPPLY VOLTAGE.IF 208 V, OYES ONO WWWWjTI
<br /> (C) CHECK SETTING OF TIME DELAY RELAY FOR LOW PRESSURE SWITCH IN CONDENSING UNIT.IT SHOULD BE SET AT ONE MINUTES(THE CHANGE TRANSFORMER WIRING IN THE COOLER COOLER
<br /> SECOND MARKER). TO THE 208 V TAP REFRIGERANT TYPE
<br /> (D) CHECK HIGH AND LOW PRESSURE CONTROLS,PRESSURE REGULATING VALVES,OIL PRESSURE SAFETY CONTROLS,AND ALL OTHER 0 YES 0 NO BOX TEMP.
<br /> SAFETY CONTROLS AND ADJUST THEM,IF NECESSARY. CHECK COMPRESSOR AMPS FOR COOLER COMPRESSORS. SUPERRHEATHEAT
<br /> SHOULD MATCH NAMEPLATE. N0. OF DEFROST/DAY � CL�I
<br /> (E) ON FREEZERS ONLY,CHECK THE LOW PRESSURE SWITCH SETTING.IT MUST BE SET TO 0 PSIG CUT OUT,10 PSIG CUT IN,TO ALLOW START 0 YES 0 NO DEFROST END TEMP O O O L COOLER/FREEZER ✓
<br /> OPERATION,ESPECIALLY IN COLD AMBIENTS. CEILING PANEL p.y
<br /> VAPOR SEAL
<br /> LIQUID LINE SHOULD ALWAYS BE INSULATED. PIPING o SYSTEM CHECKS 'z
<br /> (� .IS SUCTION LINE TRAPPED AT THE COOLER. •CHECK COMPRESSOR SUPERHEAT FOR THE
<br /> (G) WIRING DIAGRAMS,INSTRUCTION BULLETINS,ETC.ATTACHED TO THE CONDENSING UNITS SHOULD BE READ AND FILED FOR FUTURE 0 YES 0 NO COOLER(SHOULD BE BETWEEN WE.&30-F.) F—+
<br /> REFERENCE. •IS SUCTION LINE TRAPPED AT THE BLAST CHILLER?
<br /> 0 YES 0 NO 0 YES ONO 3/4"CONDENSATE DRAIN AT CEILING MOUNTED EVAP.COOLER
<br /> •FORCE UNIT INTO A DEFROST CHECK HEATER MIN. 1/4"PER FOOT SLOPE. WITH 6 FASTENING POINTS PER 88
<br /> (H) ALL FAN MOTORS ON AIR COOLED CONDENSERS,EVAPORATORS,ETC.SHOULD BE CHECKED FOR PROPER ROTATION.FAN MOTOR MOUNTS AMPS.SHOULD MATCH NAMEPLATE AMPS. UNE TO BE WRAPPED WITH MANUFACTURER'S SPECIFICATION.
<br /> SHOULD BE CAREFULLY CHECKED FOR TIGHTNESS AND PROPER ALIGNMENT. DRAIN LINES 0 YES ONO HEAT TAPE AND ENCLOSED MAXIMUM OPERATING WEIGHT=
<br /> (I) OBSERVE SYSTEM PRESSURES DURING CHARGING AND INITIAL OPERATION.DO NOT ADD OIL WHILE THE SYSTEM IS SHORT OF ARE DRAIN LINES SLOPED PROPERLY? DID BLAST CHILLER AND COOLER CYCLE OFF ON UPS AT WITH 1"INSULATION TO 155 LBS OR LESS (7
<br /> 0 YES 0 NO 0 YES ONO PREVENT FREEZING IN Q
<br /> REFRIGERANT UNLESS OIL LEVEL IS DANGEROUSLY LOW. •IS DRAIN LINE TRAPPED OUTSIDE THE COOLER? •CHECK LPS TIME DELAY RELAYSSHOULD BE SET COOLERS MAINTAINING LESS
<br /> .
<br /> OYES ONO THAN 32'F.
<br /> (J) CONTINUE CHARGING UNTIL SYSTEM HAS SUFFICIENT REFRIGERANT FOR PROPER OPERATION.DO NOT OVERCHARGE.REMEMBER THAT IS DRAIN LINE TRAPPED OUTSIDE THE BLAST CHILLER? AT 7 MINUTE FOR THE COOLER S&BLAST CHILLER
<br /> OYES ONO WALL FUNNEL DRAIN.SEE FLOOR PLAN. I--1
<br /> BUBBLES INA SIGHT GLASS MAYBE CAUSED BY A RESTRICTION AS WELL ASA SHORTAGE OF REFRIGERANT. 0 YES 0 NO •IS THE SIGHT GLASS FREE OF BUBBLES?
<br /> OYES ONO
<br /> (K) DO NOT LEAVE UNIT UNATTENDED UNTIL THE SYSTEM HAS REACHED NORMAL OPERATING CONDITIONS AND THE OIL CHARGE HAS BEEN INSULATION •ARE THE COOLER FANS AT PROPER SPEEDS?
<br /> PROPERLY ADJUSTED TO MAINTAIN THE OIL LEVEL AT THE CENTER OF THE SIGHT GLASS. •ARE LIQUID LINES FULLY INSULATED? 0 YES ONO PROJECT NO:
<br /> 0 YES 0 NO •CHECK SYSTEM FOR REFRIGERANT LEAKS.ARE THERE ANY LEAKS DRWN BY: CHK'D BY:
<br /> (L) AT INITIAL START-UP,THE SYSTEM MAY CYCLE OFF AT 2 MINUTES AND DISPLAY A LOW SUPERHEAT ERROR,THEN RESTART ITSELF.THIS .ARE SUCTION LINES FULLY INSULATED? ON THE COOLER,CONDENSING UNIT OR INTERCONNECTING DATE: 02-04-22
<br /> CYCLE MAY BE REPEATED A FEW TIMES,DO NOT SHUT THE SYSTEM OFF.LET THE SYSTEM RUN,AS IT MAY TAKE A FEW CYCLES FOR THE 0 YES 0 NO PIPING?
<br /> ELECTRIC EXPANSION VALVE TO ATTAIN THE CORRECT SETTING FOR THE DESIRED SUPERHEAT. 0 YES ONO
<br /> •CHECK SYSTEM PIPING FOR UNUSUAL VIBRATION OR NOISE.IS '^
<br /> CAUTION:EXTREME CARE MUST BE TAKEN IN STARTING COMPRESSORS FOR THE FIRST TIME AFTER SYSTEM CHARGING.AT THIS TIME,ALL OFTHEOILAND THERE ANY UNUSUAL VIBRATION OR NOISE ON THE COOLER, R-10
<br /> 1
<br /> 1
<br /> MOST OF THE REFRIGERANT MIGHT BE IN THE COMPRESSOR CREATING A CONDITION WHICH COULD CAUSE COMPRESSOR DAMAGE DUE TO SLUGGING. CONDENSING UNIT OR INTERCONNECTING PIPING? 6 EVAPORATOR MOUNTING
<br /> ACTIVATING THE CRANKCASE HEATER FOR 24 HOURS PRIOR TO START-UP IS RECOMMENDED.IF NO CRANKCASE HEATER IS PRESENT,THEN DIRECTING A 500 0 YES ONO
<br /> WATT HEAT LAMP OR OTHER SAFE HEAT SOURCE ON THE LOWER SHELL OF THE COMPRESSOR FOR APPROXIMATELY THIRTY MINUTES WILL BE BENEFICIAL IN R-101 NTS
<br /> ELIMINATING THIS CONDITION WHICH MIGHT NEVER REOCCUR.
<br />
|