My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 SW EVERETT MALL WAY NOVEL EYES 2024-06-12
>
Address Records
>
SW EVERETT MALL WAY
>
15
>
NOVEL EYES
>
15 SW EVERETT MALL WAY NOVEL EYES 2024-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 12:51:20 PM
Creation date
4/12/2024 10:09:44 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
15
Tenant Name
NOVEL EYES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2203-038 Description: 2306 SF OFFICE REMODEL TO EYE CLINIC <br /> Applied:3/14/2022 Approved:4/12/2022 Site Address: 15 SW EVERETT MALL WAY STE J <br /> Issued:5/31/2022 Finaled: 10/21/2022 City,State Zip Code: EVERETT,WA <br /> Status:ARCH IVED-FINALED Applicant: PAM KALKANDELENI <br /> Parent Permit: Owner: ROSEN BEL-KIRK ASSOCIATES LLC <br /> Parent Project: Contractor: COMMERCIAL CONST/MAINT CO LLC <br /> Details: <br /> 2306 SF OFFICE REMODEL TO EYE CLINIC <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 9/8/2022 9/8/2022 BLDG 08-FRAMING KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 9/7/2022 9:45 AM David Tomlinson <br /> Contact Name:David Tomlinson <br /> Site Address:15 SW EVERETT MALL WAY STE J <br /> Phone:4259233224 <br /> e-Mail:dtomlinson@cpmnw.com <br /> 1.Provide approved set of plans at next inspection2.Complete electrical rough in inspection Leave all areas open that are necessary for the electrical <br /> inspectorReschedule for framing inspection when ready <br /> 1.Provide approved set of plans at next inspection2.Complete electrical rough in inspection Leave all areas open that are necessary for the electrical <br /> inspectorReschedule for framing inspection when ready <br /> 1.Provide approved set of plans at next inspection2.Complete electrical rough in inspection Leave all areas open that are necessary for the electrical <br /> inspectorReschedule for framing inspection when ready <br /> 9/8/2022 9/8/2022 BLDG 10-DRYWALL KURT KECK NOT READY eTRAKiT Inspection Request <br /> NAILING <br /> Notes: <br /> 9/7/2022 9:48 AM David Tomlinson <br /> Contact Name:David Tomlinson <br /> Site Address:15 SW EVERETT MALL WAY STE J <br /> Phone:4259233224 <br /> e-Mail:dtomlinson@cpmnw.com <br /> 1.Provide approved set of plans at next inspection2.Complete electrical rough in inspection Leave all areas open that are necessary for the electrical <br /> inspector. <br /> 1. Provide approved set of plans at next inspection2.Complete electrical rough in inspection Leave all areas open that are necessary for the electrical <br /> inspector. <br /> 1.Provide approved set of plans at next inspection2.Complete electrical rough in inspection Leave all areas open that are necessary for the electrical <br /> inspector. <br /> I <br /> Printed: Friday, 12 April,2024 1 of 3 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.